[1] 张照煌,孙飞. 采用锥形刀盘的全断面隧道掘进机作业过程推力分析[J]. 工程机械,2016(7):33-37.ZHANG Zhaohuang,SUN Fei. Thrust force analysis of full face rock tunnel boring machine with cone cutterhead during excavation[J]. Construction Machinery and Equipment,2016(7):33-37. [2] 郑峥,张茜,亢一澜. 盾构装备掘进总推力的反演识别与力学建模[J]. 机械工程学报,2014,50(21):31-37.ZGENG Zheng,ZHANG Qian,KANG Yilan. Inverse identification and mechanical modeling of total thrust on shield tunneling machine[J]. Journal of Mechanical Engineering,2014,50(21):31-37. [3] 陈仁朋,刘源,汤旅军,等. 复杂地层土压平衡盾构推力和刀盘扭矩计算研究[J]. 地下空间与工程学报,2012,8(1):26-32.CHEN Renpeng,LIU Yuan,TANG Lvjun,et al.Research on calculation of thrust and cutter head torque on shield in complex strata[J]. Chinese Journal of Underground Space and Engineering,2012,8(1):26-32. [4] 蒋建东,章恩光,赵颖娣,等. 盾构刀盘振动掘削动力学建模与仿真研究[J]. 机械工程学报,2019,55(5):113-120. JIANG Jiandong,ZHANG Anguang,ZHAO Yingdi,et al. The dynamic modeling and simulation of shield tunneling cutter head in oscillatory excavation[J]. Journal of Mechanical Engineering,2019,55(5):113-120. [5] ZHANG Qian,QU Chuanyong,CAI Zongxi,et al. Modeling of the thrust and torque acting on shield machines during tunneling[J]. Automation in Construction,2014,40:60-67. [6] Liang Rongzhu,Xia Tangdai. Analysis of reverse torque of EPB shield tunneling in soft ground[J]. Journal of Central South University,2015,46(10):3814-3821. [7] 朱述敏,喻涛,熊智鹏,等. 复合型土压平衡盾构推力与刀盘扭矩计算研究[J]. 机械制造与自动化,2016(3):23-26.ZHU Shumin,YU Tao,XIONG Zhipeng,et al. Research on the calculation of thrust and cutterhead torque on the composite earth pressure balance shield machine[J]. Machine Building & Automation,2016(3):23-26. [8] GUAN Huisheng,GAO Bo. Theoretical model for estimation of cutter head torque in shield tunneling[J]. Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University,2008,43(2):213-217,226. [9] WANG Hongxin. Calculation of cutterhead torque for EPB shield and the relationship between cutterhead torque and shield driving parameters[J]. Tumu Gongcheng Xuebao/China Civil Engineering Journal,2009,42(9):109-113. [10] 刘曙光,杨云,刘国威. 砂卵石地层盾构机刀盘受力计算及有限元分析[J]. 现代制造技术与装备,2018(9):123-125.LIU Shuguang,YANG Yun,LIU Guowei. Stress calculation and finite element analysis of cutter head of shield machine in sandy cobble stratum[J]. Modern Manufacturing Technology and Equipment,2018(9):123-125. [11] ZHU Hehua,XU Qianwei. Experimental study on thrust force during tunnel excavation with earth pressure balance shield machine[J]. Yantu Lixue/Rock and Soil Mechanics,2007,28(8):1587-1594. [12] XU Qianwei,ZHU Hehua. Analysis of reasonable thrust force during tunnel excavation in homogeneous soft ground by use of earth pressure balance shield machine[J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,2008,30(1):79-85. [13] SHI Hu,GONG Guofang. Determination of thrust force for shield tunneling machine[J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science),2011,45(1):126-131. [14] WANG Lintao,GONG Guofang,SHI Hu,et al. Modeling and analysis of thrust force for EPB shield tunneling machine[J]. Automation in Construction,2012,27:138-146. [15] XU Qianwei,ZHU Hehua,DING Wenqi,et al. Cutting torque during tunnelling process of earth pressure balance shield machine in homogeneous ground[J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,2010,32(1):47-54. [16] XING Tong,GONG Guofang,YANG Huayong. Torque calculation model of cutting head in shield machine and experimental study[J]. Journal of Zhejiang University,2009,43(10):1794-1800. [17] 邓立营,刘春光,党军锋. 盾构机刀盘扭矩及盾体推力计算方法研究[J]. 矿山机械,2010,38(17):13-16.DENG Liying,LIU Chunguang,DANG Junfeng. Research on method of calculating torque of cutter head of shield machine and thrust of shield[J]. Mining & Processing Equipment,2010,38(17):13-16. [18] SONG Xin,LIU Jianqin,GUO Wei. A cutter head torque forecast model based on multivariate nonlinear regression for EPB shield tunneling[R]. 2010 Proceedings of International Conference on Artificial Intelligence and Computational Intelligence (AICI 2010),2010:104-108. [19] LU Hao,WANG Mingyang,XIA Yuanpu,et al. Calculation model of cutterhead torque for earth pressure balance shield[J]. Journal of Zhejiang University (Engineering Science),2014,48(9):1640-1645. [20] 原思聪,肖畅,尚敬强. 土压平衡式盾构机刀盘转矩的理论建模与分析[J]. 机械设计,2012(7):90-92.YUAN Sicong,XIAO Chang,SHANG Jingqiang. Theoretical modeling and analysis of EPB shield machine cutter torque[J]. Journal of Machine Design,2012(7):90-92. [21] XU Y,ZHAO W. Calculation and analysis on torque of cutter-head for EPBS in gravel stratum[J]. Recent Development of Geotechnical Engineering,2010(1):214-217. [22] 于颖,徐宝富,奚鹰,等. 软土地基土压平衡盾构切削刀盘扭矩的计算[J]. 中国工程机械学报,2004,2(3):314-318.YU Ying,XU Baofu,XI Ying,et al. Torque moment analysis of earth pressure balanced shield cutter head under soft foundation[J]. Chinese Journal of Construction Machinery,2004,2(3):314-318. [23] 徐润泽.成都富水砂卵石地层盾构施工浅析[J].科技创新导报,2010(13):86-87.XU Runze. A simple analysis of shield construction sand end gravel stratum in Chengdu[J]. Science and Technology Innovation Herald,2010(13):86-87. [24] 管会生.土压平衡盾构机关键参数与力学行为的计算模型研究[D].成都:西南交通大学,2007.GUAN Huisheng. Study on the calculating models of key parameters & mechanical behavior of the EPB shield machine[J]. Chengdu:Southwest Jiao Tong University,2007. [25] 土木学会[日].隧道标准规范(盾构篇)及解说[M].朱伟译. 北京:中国建筑工业出版社,2011.Japan Society of Civil Engineering. Tunnel standard specification (shield) and explanation[M]. ZHU Wei,trans. Beijing:China Architecture & Building Press,2011. [26] 李靖祺,徐伟.基于Herschel-Bulkley流变模型的自密实混凝土流动的CFD模拟[J].工程力学,2013,30(1):373-377.LI Jingqi,XU Wei. A CFD simulation of self-compacting concrete based on Herschel-Bulkley rheological model[J]. Engineering Mechanics,2013,30(1):373-377. |