• CN: 11-2187/TH
  • ISSN: 0577-6686

›› 2001, Vol. 37 ›› Issue (8): 80-83.

• Article • Previous Articles     Next Articles

GPGP COORDINATION MECHANISMS APPLICATION IN SHOP-FLOOR SCHEDULING SYSTEMS BASED ON MAS

Zeng Bo;Yang Jianjun   

  1. Beijing University of Aeromautics and Astronautics
  • Published:2001-08-15

Abstract: CNP is widely used in manufacturing systems based MAS (multi agent system) to solve scheduling and controlling problems. However, it has aeveral defects in solving real problems. A new method denling with task distributing and scheduling is presented and that is CNP combined with GPGP and TAEMS, and uses it in MM- MES, a manufacturing execution system based MAS, to research distributed manufacturing system’s scheduling and coordination.

Key words: Contract net protocol, GPGP, MAS, Shop floor scheduling, TAEMS

CLC Number: