[1] BAKER K R, BERTRAND J W M. An investigation of due-date assignment rules with constrained tightness[J]. Journal of Operations Management, 1981, 1(3):109-120. [2] HOLTHAUS O. Design of efficient job shop scheduling rules[J]. Computers & Industrial Engineering, 1997, 33(1-2):249-252. [3] HOLTHAUS O, RAJENDRAN C. Efficient dispatching rules for scheduling in a job shop[J]. International Journal of Production Economics, 1997, 48(1):87-105. [4] RAJENDRAN C, HOLTHAUS O. A comparative study of dispatching rules in dynamic flowshops and job shops[J]. European Journal of Operational Research, 1999, 116(1):156-170. [5] AYDIN M E, ÖZTEMEL E. Dynamic job-shop scheduling using reinforcement learning gents[J]. Robotics and Autonomous Systems, 2000, 33(2-3):169-178. [6] 万国华. 用模糊调度系统求解动态Job Shop问题[J]. 系统工程理论与实践, 2001(8):97-101. WAN Guohua. Using fuzzy scheduling system for solving a dynamic job shop problem[J]. Systems Engineering-Theory & Practice, 2001(8):97-101. [7] SABUNCUOGLU I, COMLEKCI A. Operation-based flowtime estimation in a dynamic job shop[J]. Omega, 2002, 30(6):423-442. [8] DOMINIC P D D, KALIYAMOORTHY S, KUMAR M S. Efficient dispatching rules for dynamic job shop scheduling[J]. International Journal of Advanced Manu-Facturing Technology, 2004, 24(1-2):70-75. [9] 刘琳, 谷寒雨, 席裕庚. 工件到达时间未知的动态车间滚动重调度[J]. 机械工程学报, 2008, 44(5):68-75. LIU Lin, GU Hanyu, XI Yugeng. Reschedluing algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time[J]. Journal of Mecha-nical Engineering, 2008, 44(5):68-75. [10] KAPANOGLU M, ALIKALFA M. Learning IF-THEN priority rules for dynamic job shops using genetic algorithms[J]. Robotics and Computer Integrated Manu-facturing, 2011, 27(1):47-55. [11] KORYTKOWSKI P, WIŚNIEWSKI T, RYMASZEWSKI S. An evolutionary simulation-based optimization approach for dispatching scheduling[J]. Simulation Modelling Practice and Theory, 2013, 35(6):69-85. [12] SCHOLZ-REITER B, HILDEBRANDT T, TAN Y. Effective and efficient scheduling of dynamic job shops:Combining the shifting bottleneck procedure with variable neighbourhood search[J]. CIRP Annals-Manufacturing Technology, 2013, 62(1):423-426. [13] PERGHER I, ALMEIDA A T. A multi-attribute, rank-dependent utility model for selecting dispatching rules[J]. Journal of Manufacturing Systems, 2018, 46(1):264-271. [14] 范华丽, 熊禾根, 蒋国璋, 等. 基于遗传规划的动态作业车间调度规则生成[J]. 计算机集成制造系统, 2018, 24(4):876-885. FAN Huali, XIONG Hegen, JIANG Guozhang, et al. Research on the generation of dispatching rules for dynamic Job-shop scheduling problem based on genetic programming algorithm[J]. Computer Integrated Manu-facturing Systems, 2018, 24(4):876-885. [15] VINOD V, SRIDHARAN R. Scheduling a dynamic job shop production system with sequence-dependent setups:An experimental study[J]. Robotics and Computer-Integrated Manufacturing, 2008, 24(3):435-449. [16] SHARMA P, JAIN A. Performance analysis of dispatching rules in a stochastic dynamic job shop manu-facturing system with sequence-dependent setup times:Simulation approach[J]. CIRP Journal of Manufacturing Science and Technology, 2015, 10(8):110-119. [17] 汪双喜, 张超勇, 刘琼, 等. 不同再调度周期下的柔性作业车间动态调度[J]. 计算机集成制造系统, 2014, 20(10):2470-2478. WANG Shuangxi, ZHANG Chaoyong, LIU Qiong, et al. Flexible job shop dynamic scheduling under different rescheduling period[J]. Computer Integrated Manufacturing Systems, 2014, 20(10):2470-2478. [18] SHEN Xiaoning, YAO Xin. Mathematical modeling and multi-objective evolutionary algorithms applied to dynamic flexible job shop scheduling problems[J]. Information Sciences, 2015, 298(3):198-224. [19] ZHOU Yong, YANG Jianjun. Automatic design of scheduling policies for dynamic flexible job shop sche-duling by multi-objective genetic programming based hyper-heuristic[J]. Procedia CIRP, 2019, 79:439-444. [20] MOHANASUNDARAM K M, NATARAJAN K, VISWANATHKUMAR G, et al. Scheduling rules for dynamic shops that manufacture multi-level jobs[J]. Computers & Industrial Engineering, 2003, 44(1):119-131. [21] THIAGARAJAN S, RAJENDRAN C. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs[J]. Computers & Industrial Engineering, 2005, 49(4):463-503. [22] 边志兴. 作业车间的模糊动态调度问题研究[J]. 中国管理科学, 2008, 16(8):76-83. BIAN Zhixing. Study on the fuzzy dynamic scheduling under the job shop environments[J]. Chinese Journal of Management Science, 2008, 16(8):76-83. [23] HOLTHAUS O. Scheduling in job shops with machine breakdowns:An experimental study[J]. Computers and Industrial Engineering, 1999, 36(99):137-162. [24] KUTANOGLU E, SABUNCUOGLU I. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop[J]. Journal of Manufacturing Systems, 2001, 20(4):264-279. [25] ADIBI M A, ZANDIEH M, AMIRI M. Multi-objective scheduling of dynamic job shop using variable neigh-borhood search[J]. Expert Systems with Applications, 2010, 37(1):282-287. [26] QIU X, LAU H Y K. An AIS-based hybrid algorithm with PDRs for multi-objective dynamic online job shop scheduling problem[J]. Applied Soft Computing, 2013, 13(3):1340-1351. [27] SWEENEY K D, SWEENEY Ⅱ D C, CAMPBELL J F. The performance of priority dispatching rules in a complex job shop:A study on the Upper Mississippi River[J]. International Journal of Production Economics, 2019, 216(10):154-172. [28] SHAHRABI J, ADIBI M A, MAHOOTCHI M. A reinforcement learning approach to parameter estimation in dynamic job shop scheduling[J]. Computers & Industrial Engineering, 2017, 110(8):75-82. [29] 连坤雷, 张超勇, 高亮, 等. 一种基于改进遗传算法的多目标动态调度优化[J]. 中国制造业信息化, 2010, 39(3):13-17. LIAN Kunlei, ZHANG Chaoyong, GAO Liang, et al. An improved genetic algorithm for multi-objective dynamic scheduling optimization[J]. Manufacturing Information Engineering of China, 2010, 39(3):13-17. [30] 王万良, 王磊, 王海燕, 等. 基于混合差分进化算法的作业车间动态调度[J]. 计算机集成制造系统, 2012, 18(3):531-539. WANG Wanliang, WANG Lei, WANG Haiyan, et al. Dyamic job shop scheduling based on hybrid differential evolution algorithm[J]. Computer Integrated Manufacturing Systems, 2012, 18(3):531-539. [31] KUNDAKCI N, KULAK O. Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem[J]. Computers & Industrial Engineering, 2016, 96(6):31-51. [32] 熊禾根, 李建军, 孔建益, 等. 考虑工序相关性的动态Job shop调度问题启发式算法[J]. 机械工程学报, 2006, 42(8):50-55. XIONG Hegen, LI Jianjun, KONG Jianyi, et al. Heuristic method for dynamic job shop scheduling problem with operation relativity[J]. Journal of Mechanical Engineering, 2006, 42(8):50-55. [33] XIONG Hegen, FAN Huali, JIANG Guozhang. A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints[J]. European Journal of Operational Research, 2017, 257(1):13-24. [34] JACKSON J R. Jobshop-like queueing systems[J]. Management Science, 1963, 10(1):518-521. [35] LENSTRA J K, RINNOOY KAN A H G, BRUCKER P. Complexity of machine scheduling problems[J]. Annals of Discrete Mathematics, 1977, 1(12):343-362. [36] PERGHER I, ALMEIDA A T. A multi-attribute, rank-dependent utility model for selecting dispatching rules[J]. Journal of Manufacturing Systems, 2018, 46(1):264-271. [37] KENYON G, CANEL C NEUREUTHER B D. The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing[J]. International Journal of Production Economics, 2005, 97(3):263-278. [38] SUBRAMANIAMV, RAMESHT, LEE G K, et al. Job shop scheduling with dynamic fuzzy selection of dispa-tching rules[J]. The International Journal of Advanced Manufacturing Technology, 2000, 16(10):759-764. [39] CHANG F R. A study of due-date assignment rules with constrained tightness in a dynamic job shop[J]. Computers & Industrial Engineering, 1996, 31(1-2):205-208. [40] GÜÇDEMIR H, SELIMH. Customer centric production planning and control in job shops:A simulation optimization approach. Journal of Manufacturing Systems[J], 2017, 43(4):100-116. [41] GÜÇDEMIR H, SELIMH. Integrating simulation mode-lling and multi criteria decision making for customer focused scheduling in job shops[J]. Simulation Modelling Practice and Theory, 2018, 88(11):17-31. [42] BLOCHER J D, CHHAJED D, LEUNG M. Customer order scheduling in a general job shop environment[J]. Decision Sciences, 1998, 29(4):951-981. [43] 徐华, 张庭. 混合离散蝙蝠算法求解多目标柔性作业车间调度[J]. 机械工程学报, 2016, 52(18):201-212. XU Hua, ZHANG Ting. Hybrid discrete bat algorithm for solving the multi-objective flexible job shop scheduling problem[J]. Journal of Mechanical Engineering, 2016, 52(18):201-212. [44] 何彦, 王乐祥, 李育锋, 等. 一种面向机械车间柔性工艺路线的加工任务节能调度方法[J]. 机械工程学报, 2016, 52(19):168-179. HE Yan, WANG Lexiang, LI Yufeng, et al. A scheduling method for reducing energy consumption of machining job shops considering the flexible process plan[J]. Journal of Mechanical Engineering, 2016, 52(19):168-179. [45] 李聪波, 沈欢, 李玲玲, 等. 面向能耗的多工艺路线柔性作业车间分批优化调度模型[J]. 机械工程学报, 2017, 53(5):12-23. LI Congbo, SHEN Huan, LI Lingling, et al. A batch splitting flexible job shop scheduling model for energy saving under alternative process plans[J]. Journal of Mechanical Engineering, 2017, 53(5):12-23. |