[1] BRUCKER P, SCHLIE R. Job-shop scheduling with multi-purpose machines[J]. Computering, 1990, 45(4):369-375. [2] 何彦,王乐祥,李育锋,等. 一种面向机械车间柔性工艺路线的加工任务节能调度方法[J]. 机械工程学报, 2016, 52(19):168-179 HE Yan, WANG Lexiang, LI Yufeng, et al. A scheduling method for reducing energy consumption of machining job shops considering the flexible process plan[J]. Journal of Mechanical Engineering, 2016, 52(19):168-179. [3] 朱传军,邱文,朱孟周,等. 随机工时下的多目标柔性作业车间鲁棒调度问题[J]. 中国机械工程, 2016, 27(12):1667-1672, 1678. ZHU Chuanjun, QIU Wen, ZHU Mengzhou, et al. Multi-objective flexible job shops robust scheduling problem under stochastic processing times[J]. China Mechanical Engineering, 2016, 27(12):1667-1672, 1678. [4] 汪俊亮,张洁,秦威,等. 加工时间不确定的柔性作业车间鲁棒调度方法[J]. 中国机械工程, 2015, 26(5):627-632. WANG Junliang, ZHANG Jie, QIN Wei, et al. Robust scheduling on flexible job shop with uncertain processing time[J]. China Mechanical Engineering, 2015, 26(5):627-632. [5] TANG Dunbing, DAI Min. Energy-efficient approach to minimizing the energy consumption in an extended job-shop scheduling problem[J]. Chinese Journal of Mechanical Engineering, 2015, 28(5):1048-1055. [6] 赵宁,李开典,田青,等. 考虑运输时间柔性作业车间调度问题的快速寻优方法[J]. 计算机集成制造系统, 2015, 21(3):724-732. ZHAO Ning, LI Kaidian, TIAN Qing, et al. Fast optimization approach of flexible job shop scheduling with transport time condieration[J]. Computer Integrated Manufacturing Systems, 2015, 21(3):724-732. [7] AHMADI E, ZANDIEH M, FARROKH M, et al. A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms[J]. Computers & Operations Research, 2016, 73:56-66. [8] YI Wenchao, LI Xinyu, PAN Baolin. Solving flexible job shop scheduling using an effective memetic algorithm[J]. International Journal of Computer Applications in Technology, 2016, 53(2):157-163. [9] LI Xinyu, GAO Liang. An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem[J]. International Journal of Production Economics, 2016, 174:93-110. [10] GONZÁLEZ M, VELA C, VARELA R. Scatter search with path relinking for the flexible job shop scheduling problem[J]. European Journal of Operational Research, 2015, 245(1):35-45. [11] 赵诗奎. 基于新型邻域结构的混合算法求解作业车间调度[J]. 机械工程学报, 2016, 52(9):141-150. ZHAO Shikui. A hybrid algorithm with a new neighborhood structure for the job shop scheduling problem[J]. Journal of Mechanical Engineering, 2016, 52(9):141-150. [12] GAO K Z, SUGANTHAN P N, TASGETIREN M F, et al. Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion[J]. Computers & Industrial Engineering, 2015, 90(C):107-117. [13] PÉREZ M A F, RAUPP F M P. A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem[J]. Journal of Intelligent Manufacturing, 2016, 27(2):409-416. [14] ZHAO Ning, YE Song, LI Kaidian et al. Effective iterated greedy algorithm for flow-shop scheduling problems with time lags[J]. Chinese Journal of Mechanical Engineering 2017, 30(3):652-662 [15] NELSON R T. Labor and machine limited production system[J]. Management Science, 1967, 13(9):648-671. [16] 李兢尧,孙树栋,黄媛,等. 求解双资源约束车间调度问题的继承式双目标遗传算法[J]. 控制与决策, 2011, 26(12):1761-1767. LI Jingyao, SUN Shudong, HUANG Yuan, et al. Double-objective inherited genetic algorithm for dual resource constrained job shop[J]. Control and Desicison, 2011, 26(12):1761-1767. [17] LI Jingyao, HUANG Yuan, NIU Xinwei. A branch population genetic algorithm for dual-resource constrained job shop scheduling problem[J]. Computers & Industrial Engineering, 2016, 102:113-131. [18] 曾强,沈玲,任华,等. 双资源批量生产柔性作业车间多目标调度方法[J]. 计算机工程与应用, 2015, 51(1):250-256. ZENG Qiang, SHEN Ling, REN Hua et al. Multi-objective scheduling method for batch production FJSP with dual-resource[J]. Computer Engineering and Applications, 2015, 51(1):250-256. [19] 张洁,张朋,刘国宝. 基于两阶段蚁群算法的带非等效并行机的作业车间调度[J]. 机械工程学报,2013,49(6):136-144. ZHANG Jie, ZHANG Peng, LIU Guobao. Two-stage ant colony algorithm based job shop scheduling with unrelated parallel machines[J]. Journal of Mechanical Engineering, 2013, 49(6):136-144. [20] 周亚勤,李蓓智,杨建国. 考虑批量和辅助时间等生产工况的智能调度方法[J]. 机械工程学报, 2006, 42(1):52-56. ZHOU Yaqin, LI Beizhi, YANG Jianguo. Intelligent scheduling algorithm for problems with batch and cutting time[J]. Chinese Journal of Mechanical Engineering, 2006, 42(1):52-56. [21] KACEM I, HAMMADI S, BORNE P. Approach by localization and multi objective evolutionary optimization for flexible job-shop scheduling problems[J]. IEEE Transaction Systems,Man,and Cybernetics-Part C,2002, 32(1):1-13. [22] 张国辉,高亮,李培根,等. 改进遗传算法求解柔性作业车间调度问题[J]. 机械工程学报, 2009, 45(7):145-151. ZHANG Guohui, GAO Liang, LI Peigen, et al. Improved genetic algorithm for the flexible job-shop scheduling problem[J]. Journal of Mechanical Engineering, 2009, 45(7):145-151. |