[1] ZHAO F, TANG J, WANG J, et al. An improved particle swarm optimization with a linearly decreasing disturbance term for flow shop scheduling with limited buffers[J]. International Journal of Computer Integrated Manufacturing, 2014, 27(5):488-499. [2] 谢展鹏,张超勇,邵新宇,等. 基于Memetic算法的有限缓冲区流水车间调度问题[J]. 计算机集成制造系统, 2015, 21(5):1254-1261. XIE Zhanpeng, ZHANG Chaoyong, SHAO Xinyu, et al. Flow shop scheduling with limited buffers based on Memetic algorithm[J]. Computer Integrated Manufacturing Systems, 2015, 21(5):1254-1261. [3] PAN Q K, WANG L, GAO L, et al. An effective hybrid discrete differential evolution algorithm for flow shop scheduling with intermediate buffers[J]. Information Sciences, 2011, 181:668-685. [4] 胡蓉, 钱斌. 一种求解随机有限缓冲区流水线调度的混合差分进化算法[J]. 自动化学报, 2009, 35(12):1580-1586. HU Rong, QIAN Bin. A hybrid differential evolution algorithm for stochastic flow shop scheduling with limited buffers[J]. Acta Automatica Sinica, 2009, 35(12):1580-1586. [5] QING F, APPALYER S, KUNPENG L. Optimisation of flow-shop scheduling with batch processor and limited buffer[J]. Inernational Journal of Production Research, 2012, 50(8):2267-2285. [6] 张培文,潘全科,李俊青,等. 有限缓冲区流水车间调度的混合人工蜂群算法[J]. 计算机集成制造系统, 2013, 19(10):2510-2511. ZHANG Peiwen, PAN Quanke, LI Junqing, et al. Hybrid artificial bee colony algorithms for flowshop scheduling problem with limited buffers[J]. Computer Integrated Manufacturing Systems, 2013, 19(10):2510-2511. [7] ZHANG S, WONG T N. Studying the impact of sequence-dependent set-up times in integrated process planning and scheduling with E-ACO heuristic[J]. International Journal of Production Research, 2016, 54(16):4815-4838. [8] SHEN L, DSUZERE P, NEUFELD J S. Solving the flexible job shop scheduling problem with sequence-dependent setup times[J]. European Journal of Operational Research, 2018, 265(2):503-516.. [9] TRAN T T, ARAUJO A, BECH J C. Decomposition methods for the parallel machine scheduling problem with setups[J]. INFORMS Journal on Computing, 2016, 28(1):83-95. [10] 钟涛,萧卫,徐宏云,等. 带机器准备时间的单机调度问题的混合进化算法研究[J]. 计算机应用研究, 2013, 30(11):3249-3252. ZHONG Tao, XIAO Wei, XU Hongyun, et al. Hybrid evolutionary algorithm for solving single-machine scheduling problem with setup times[J]. Application Research of Computer, 2013, 30(11):3249-3252. [11] BENKALAI I, REEBAINE D, GAGNE C, et al. Improving the migrating birds optimization metaheuristic for the permutation flow shop with sequence-dependent set-up times[J]. International Journal of Production Research, 2017, 55(20):6145-6157. [12] PAN Q K, GAO L, LI X Y, et al. Effective metaheuristics for scheduling a hybrid flow shop with sequence-dependent setup times[J]. Applied Mathematics and Computation, 2017, 303:89-112. [13] AN Y J, KIM Y D, CHOI S W. Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times[J]. Computers & Operations Research, 2016, 71:127-136. [14] LENSTRA J K, KAN A H G R, BRUCKER P. Complexity of machine scheduling problems[J]. Studies in integer programming, 1977, 1:343-362. [15] HARIK G R, LOBO F G, GOLDBERG D E. The compact genetic algorithm[J]. IEEE Transactions on Evolutionary Computation, 1999, 3(4):287-297. [16] DA S R R, ERIG L C R, LOPES H S. Template matching in digital images using a compact genetic algorithm with elitism and mutation[J]. Journal of Circuits, Systems, and Computers, 2010, 19(1):91-106. [17] 韩忠华,朱一行,史海波,等. 基于改进紧致遗传算法的柔性流水车间组批排产优化问题研究[J]. 系统工程理论与实践, 2016, 36(6):1617-1624. HAN Zhonghua, ZHU Yihang,, SHI Haibo, et al. Study for the flexible flow shop scheduling problem with batch process machines based on an advanced compact genetic algorithm[J]. Systems Engineering-Theory & Practice, 2016, 36(6):1617-1624. [18] 李聪波,沈欢,李玲玲,等. 面向能耗的多工艺路线柔性作业车间分批优化调度模型[J]. 机械工程学报, 2017, 53(5):12-23. LI Congbo, ZHEN Huan, LI Lingling, et al. A batch splitting flexible job shop scheduling model for energy saving under alternative process plans[J]. Journal of Mechanical Engineering, 2017, 53(5):12-23. [19] 赵兴旺, 梁吉业. 一种基于信息熵的混合数据属性加权聚类算法[J]. 计算机研究与发展, 2016, 53(5):1019-1027. ZHAO Xingwang, LING Jiye. An Attribute Weighted Clustering Algorithm for Mixed Data Based on Information Entropy[J]. Journal of Computer Research and Development, 2016, 53(5):1019-1027. [20] ALAYKYRAN K, ENGIN O, DOYEN A. Using ant colony optimization to solve hybrid flow shop scheduling problems[J]. The International Journal of Advanced Manufacturing Technology, 2007, 35(5-6):541-550. [21] NERSON E, BAPTISTE P, GUPTA J N D. Solving hybrid flow shop problem using energetic reasoning and global operations[J]. Omega, 2001, 29(6):501-511. [22] SANTOS D L, HUNSUCKER J L, DEAL D E. Global lower bounds for flow shop with multiple processors[J]. European Journal of Operational Research, 1995, 80(1):112-120. [23] 徐华, 张庭. 混合离散蝙蝠算法求解多目标柔性作业车间调度[J]. 机械工程学报, 2016, 52(18):201-211. XU Hua, ZHANG Ting. Hybrid discrete bat algorithm for solving the multi-objective flexible job shop scheduling problem[J]. Journal of Mechanical Engineering, 2016, 52(18):201-211. |