[1] 沈世钊,范峰,钱宏亮. FAST主动反射面支承结构总体方案研究[J]. 建筑结构学报, 2010, 31(12):1-8. SHEN Shizhao, FAN Feng, QIAN Hongliang. Research on support structure scheme or active reflector of FAST[J]. Journal of Building Structures, 2010, 31(12):1-8. [2] 朱万旭,李长乐,张国强,等. 国家天文台500m口径天文望远镜索网安装施工[J]. 施工技术, 2016, 45(14):51-53. ZHU Wanxu, LI Changle, ZHANG Guoqiang, et al. The installation of 500 m diameter astronomical telescope cable network for national astronomical observatories[J]. Construction Technology, 2016, 45(14):51-53. [3] 金晓飞,范峰,沈世钊. 巨型射电望远镜(FAST)反射面支承结构参数敏感性分析[J]. 土木工程学报, 2010, 43(2):12-19. JIN Xiaofei, FAN Feng, SHEN Shizhao. Parameter sensitivity analysis of the cable-net structure supporting the reflector of a larger radio telescope-FAST[J]. Civil Engineering Journal, 2010, 43(2):12-19. [4] GB/T18365-2001. 斜拉桥热挤聚乙烯高强钢丝拉索技术条件[S]. 2001. GB/T18365-2001. Technical conditions for hot-extruding PE protection high strength wire cable of cable-stayed bridge[S]. 2001. [5] 郭彦林,田广宇,张博浩. 基于一次二阶矩可靠度指标的车辐式结构索长误差控制限值研究[J]. 材料科学与工程学报, 2010, 27(4):69-77. GUO Yanlin, TIAN Guangyu, ZHANG Bohao, et al. Research on deviation control of cable's length in spoke structures based on first-order-second-moment reliability index[J]. Journal of Architecture and Civil Engineering, 2010, 27(4):69-77. [6] 赵平,孙善星,周文胜. 索长误差对索穹顶结构初始预应力分布的敏感性分析[J]. 建筑技术, 2013, 44(7):638-640. ZHAO Ping, SUN Shanxing, ZHOU Wensheng. Analysis on sensitivity of cable length error to initial prestress distribution on cabled dome structure[J]. Architecture Technology, 2013, 44(7):638-640. [7] 谷川,杨玉泉. 吊杆、索长精确测量方法研究[J]. 城市道桥与防洪, 2009, 12:113-116, 21. GU Chuan, YANG Yuquan. Study of exact measuring methods for suspender and cable length[J]. City Bridge and Flood Control, 2009, 12:113-116, 21. [8] 马如进,张其林,陈鲁,等. 频率法测量拉索索力中钢索计算长度的理论与试验研究[C]//第三届全国钢结构工程技术交流会论文集, 2010:5. MA Rujin, ZHANG Qilin, CHEN Lu, et al. Test research and in mess calculation length theory of steel cable cable-force with frequency method[C]//Proceedings of The Third Session of The National Steel Structure Engineering Technology Exchange Meeting, 2010:5. [9] 曹海滨,郝景雨,蔡志娥,等. 斜拉桥拉索无应力长度的算法研究[J]. 中南公路工程, 2004(2):45-47. CAO Haibin, HAO Jingyu, CAI Zhier, et al. Algorithm for calculating non-stress length of cable for cable-stayed bridges[J]. Central South Highway Engineering, 2004(2):45-47. [10] 宋郁民,吴定俊,薛炳勇. 斜拉桥柔性拉索无应力索长的精确计算[J]. 施工技术, 2011(3):42-43, 47. SONG Yumin, WU Dingjun, XUE Bingyong. Precise calculation of unstressed flexible cable length in cable-stayed bridge[J]. Construction technology, 2011(3):42-43, 47. [11] 程旭平, 陈炜锋. 重庆江津观音岩长江大桥斜拉索制造长度控制[J]. 公路交通技术, 2009(6):85-87. CHENG Xuping, CHEN Weifeng. Control for fabrication length of stay cables in Guanyinyan Yangtze River Bridge in Jiangjin Chongqing[J]. Technology of Highway and Transport, 2009(6):85-87. [12] 刘立军. 初始应力对预应力钢绞线松弛率影响的试验研究[J]. 金属制品, 2000, 26(1):41-42. LIU Lijun. Test research for the effect of initiative stress on relaxation rate of PC steel strand[J]. Metal Products, 2000, 26(1):41-42. [13] 国际预应力混凝土协会. CBE-FIP样本规范[S]. 1990. FIP. CBE-FIP Model Code[S]. 1990. [14] 陈志华,刘占省. 拉索线膨胀系数试验研究[J]. 建筑材料学报, 2010, 13(5):626-631. CHEN Zhihua, LIU Zhansheng. Experimental research of linear thermal expansion coefficient of cables[J]. Journal of Building Material, 2010, 13(5):626-631. |