[1] 任杉,张映锋,黄彬彬. 生命周期大数据驱动的复杂产品智能制造服务新模式研究[J]. 机械工程学报,2018,54(22):194-203. REN Shan,ZHANG Yingfeng,HUANG Binbin. New pattern of lifecycle big-data-driven smart manufacturing service for complex product[J]. Journal of Mechanical Engineering,2018,54(22):194-203. [2] 张映锋,郭振刚,钱成,等. 基于过程感知的底层制造资源智能化建模及其自适应协同优化方法研究[J]. 机械工程学报,2018,54(16):1-10. ZHANG Yingfeng,GUO Zhengang,QIAN Cheng,et al. Investigation on process-aware based intelligent modeling of bottom layer manufacturing resources and self-adaptive collaborative optimization methodology[J]. Journal of Mechanical Engineering,2018,54(16):1-10. [3] GAO K Z,SUGANTHAN P N,PAN Q K,et al. Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion[J]. Knowledge-Based Systems,2016,109(10):1-16. [4] LUO X,QIAN Q,FU Y F. Improved genetic algorithm for solving flexible job shop scheduling problem[J]. Procedia Computer Science,2020,166(5):480-485. [5] 苑明海,张理志,周开俊,等. 基于混合遗传算法的柔性车间调度问题研究[J]. 工业工程与管理,2022,27(1):1-17. YUAN Minghai,ZHANG Lizhi,ZHOU Kaijun,et al. Research on flexible shop scheduling based on improved hybrid genetic[J]. Industrial Engineering and Management,2022,27(1):1-17. [6] MENG L,ZHANG C,ZHANG B,et al. Mathematical modeling and optimization of energy-conscious flexible job shop scheduling problem with worker flexibility[J]. IEEE Access,2019,7(13):68043-68059. [7] ZAMISKA J R,JABER M Y,KHER H V. Worker deployment in dual resource constrained systems with a task-type factor[J]. European Journal of Operational Research,2007,177(3):1507-1519. [8] NELSON R T. Labor and machine limited production system[J]. Management Science,1967,13(9):648-671. [9] XU J,XU X,XIE S Q. Recent developments in dual resource constrained (DRC) system research[J]. European Journal of Operational Research,2011,215(2):309-318. [10] 李兢尧,孙树栋,黄媛,等. 求解双资源约束车间调度问题的继承式双目标遗传算法[J]. 控制与决策,2011,26(12):1761-1767. LI Jingyao,SUN Shudong,HUANG Yuan,et al. Double-objective inherited genetic algorithm for dual resource constrained job shop[J]. Control and Decision,2011,26(12):1761-1767. [11] LI J Y,HUANG Y,NIU X W. A branch population genetic algorithm for dual-resource constrained job shop scheduling problem[J]. Computers & Industrial Engineering,2016,102(12):113-131. [12] TAN W H,YUAN X F,WANG J L,et al. A fatigue-conscious dual resource constrained flexible job shop scheduling problem by enhanced NSGA-II:An application from casting workshop[J]. Computers & Industrial Engineering,2021,160(10):1-17. [13] HOPP W J,TEKIN E,VAN OYEN M P. Benefits of skill chaining in serial production lines with cross-trained workers[J]. Management Science,2004,50(1):83-98. [14] BRUCKER P,SCHLIE R. Job-shop scheduling with multi-purpose machines[J]. Computing,1990,45(4):369-375. [15] PEZZELLA F,MORGANTI G,CIASCHETTI G. A genetic algorithm for the flexible job-shop scheduling problem[J]. Computers and Operations Research,2008,35(10):3202-3212. [16] GAO K,CAO Z,ZHANG L,et al. A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems[J]. IEEE/CAA Journal of Automatica Sinica,2019,6(4):904-916. [17] 李红亚,彭昱忠,邓楚燕,等. GA与PSO的混合研究综述[J]. 计算机工程与应用,2018,54(2):20-28,39. LI Hongya,PENG Yuzhong,DENG Chuyan,et al. Review of hybrids of GA and PSO[J]. Computer Engineering and Applications,2018,54(2):20-28,39. [18] MUDJIHARTONO P,JIAMTHAPTHAKSIN R,TANPRASERT T. Parallelized GA-PSO algorithm for solving job shop scheduling problem[C]//20162nd International Conference on Science in Information Technology (ICSITech). Balikpapan:IEEE,2016,103-108. [19] MENG Q,ZHANG L,FAN Y. A hybrid particle swarm optimization algorithm for solving job shop scheduling problems[J]. Communications in Computer and Information Science,2016,644(10):71-78. [20] SUN L,LIN L,LI H J,et al. Large scale flexible scheduling optimization by a distributed evolutionary algorithm[J]. Computers & Industrial Engineering,2019,128(2):894-904. [21] SU X,HAN W,WU Y,et al. A robust scheduling optimization method for flight deck operations of air craft carrier with ternary interval durations[J]. IEEE Access,2018,6(11):69918-69936. [22] 冀凌博. 改进差分进化算法在柔性作业车间调度的应用与研究[D]. 大连:大连交通大学,2020. JI Lingbo. Application and research of improved differential evolution algorithm in flexible job shop scheduling[D]. Dalian:Dalian Jiaotong University,2020. [23] 张源,陶翼飞,王加冕. 改进差分进化算法求解混合流水车间调度问题[J]. 中国机械工程,2021,32(6):714-720. ZHANG Yuan,TAO Yifei,WANG Jiamian. An improved DE algorithm for solving hybrid flow-shop scheduling problems[J]. China Mechanical Engineering,2021,32(6):714-720. [24] VAN DE VONDER S,DEMEULEMEESTER E,HERROELEN W. A classification of predictive-reactive project scheduling procedures[J]. Journal of Scheduling,2007,10(3):195-207. [25] YUAN P,HAN W,SU X,et al. A dynamic scheduling method for carrier aircraft support operation under uncertain conditions based on rolling horizon strategy[J]. Applied Sciences,2018,8(9):1-23. [26] HAUDER V A,BEHAM A,RAGGL S,et al. Resource constrained multi-project scheduling with activity and time flexibility[J]. Computers & Industrial Engineering,2020,150(12):106857-106870. [27] BALOUKA N,COHEN I. A robust optimization approach for the multi-mode resource-constrained project scheduling problem[J]. European Journal of Operational Research,2021,291(2):457-470. [28] GU J,GU M,CAO C,et al. A novel competitive co-evolutionary quantum genetic algorithm for stochastic Job shop scheduling problem[J]. Computers & Operations Research,2010,37(5):927-937. [29] HORNG S C,LIN S,YANG F Y. Evolutionary algorithm for stochastic job shop scheduling with random processing time[J]. Expert Systems with Applications,2012,39(3):3603-3610. [30] LEI D. Simplified multi-objective genetic algorithms for stochastic Job shop scheduling[J]. Applied Soft Computing,2011,11(8):4991-4996. [31] JAMILI A. Robust job shop scheduling problem: Mathematical models,exact and heuristic algorithms[J]. Expert Systems with Applications,2016,55(12):341-350. [32] 肖世昌,吴自高,孙树栋,等. 双资源约束的鲁棒Job Shop调度问题研究[J]. 机械工程学报,2021,57(4):227-239. XIAO Shichang,WU Zigao,SUN Shudong,et al. Research on the dual-resource constrained robust job shop scheduling problems[J]. Journal of Mechanical Engineering,2021,57(4):227-239. [33] 汪俊亮,张洁,秦威,等. 加工时间不确定的柔性作业车间鲁棒调度方法[J]. 中国机械工程,2015,26(5):627-632. WANG Junliang,ZHANG Jie,QIN Wei,et al. Roubust scheduling of flexible job shop with uncertain processing time[J]. China Mechanical Engineering,2015,26(5):627-632. [34] 万兵,苏析超,郭放,等. 不确定性工时下甲板作业的前摄性鲁棒调度[J]. 航空学报,2022,43(1):1-18. WANG Bing,SU Xichao,GUO Fang,et al. A study for proactive robust scheduling of aircraft carrier flight deck operations with uncertain activity durations[J]. Acta Aeronautica et Astronautica Sinica,2022,43(1):1-18. [35] 魏鑫,张泽群,唐敦兵,等. 面向节能的导弹结构件混线生产作业车间多目标调度研究[J]. 机械工程学报,2018,54(9):45-54. WEI Xin,ZHANG Zequn,TANG Dunbing,et al. Energy-saving oriented multi-objective shop floor scheduling for mixed-line production of missile components[J]. Journal of Mechanical Engineering,2018,54(9):45-54. [36] KACEM I,HAMMADI S,BORNE P. Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems[J]. IEEE Trans. Systems,Man,and Cybernetics,Part C,2002,32(1):1-13. [37] 陈强,王宇嘉,林炜星,等. 改进粒子群算法求解分布式柔性车间调度问题[J]. 电子科技,2021,34(10):63-68. CHEN Qiang,WANG Yujia,LIN Weixing,et al. An improve particle swarm optimization algorithm for distribution and flexible job-shop scheduling problem[J]. Electronic Science and Technology,2021,34(10):63-68.