[1] MOUZON G,YILDIRIM M,TWOMEY J. Operational methods for minimization of energy consumption of manufacturing equipment[J]. International Journal of Production Research,2007,45(18-19):4247-4271. [2] FENG Y X,HONG Z X,LI Z W,et al. Integrated intelligent green scheduling of sustainable flexible workshop with edge computing considering uncertain machine state[J]. Journal of Cleaner Production,2020,246:119070. [3] LI Y F,HE Y,WANG Y L,et al. An optimization method for energy-conscious production in flexible machining job shops with dynamic job arrivals and machine breakdowns[J]. Journal of Cleaner Production,2020,254:120009. [4] REN W B,WEN J Q,YAN Y,et al. Multi-objective optimisation for energy-aware flexible job-shop scheduling problem with assembly operations[J].International Journal of Production Research,2020(3):1-16. [5] 刘琼,梅侦.面向低碳的工艺规划与车间调度集成优化[J].机械工程学报,2017,53(11):165-174.LIU Qiong,MEI Zhen. Integrated optimization of process planning and shop scheduling for reducing manufacturing carbon emissions[J]. Journal of Mechanical Engineering,2017,53(11):165-174. [6] 朱光宇,徐文婕.考虑能耗与质量的机床构件生产线多目标柔性作业车间调度方法[J].控制与决策,2019,34(2):253-260.ZHU Guangyu,XU Wenjie. Multi-objective flexible job shop scheduling method for machine tool component production line considering energy consumption and quality[J]. Control and Decision,2019,34(2):253-260. [7] 孟磊磊,张超勇,邵新宇,等.面向节能的工艺规划与调度集成问题建模研究[J].机械工程学报,2019,55(16):185-195.MENG Leilei,ZHANG Chaoyong,SHAO Xinyu,et al.Mathematical modeling of energy-efficient integration of process planning and scheduling[J]. Journal of Mechanical Engineering,2019,55(16):185-195. [8] 段建国,李豪晨,张青雷.面向绿色制造的半组合式船用曲轴结构件生产车间多目标调度优化[J].计算机集成制造系统,2021,27(6):1714-1727.DUAN Jianguo,LI Haochen,ZHANG Qinglei. Green manufacturing-oriented multi-objective scheduling optimization for half built-up marine crank shaft component workshop[J]. Computer Integrated Manufacturing Systems,2021,27(6):1714-1727. [9] 王海燕,王万良,黄风立,等.分批优化调度问题综述及面向节能研究展望[J].计算机集成制造系统,2017,23(3):543-556.WANG Haiyan,WANG Wanliang,HUANG Fengli,et al.Survey on production scheduling with lot splitting and prospect for energy-saving scheduling[J]. Computer Integrated Manufacturing Systems,2017,23(3):543-556. [10] LI J Q,DENG J W,LI C Y,et al. An improved Jaya algorithm for solving the flexible job shop scheduling problem with transportation and setup times[J].Knowledge-Based Systems,2020,200(3):106032. [11] CHEN R H,YANG B,LI S,et al. A self-learning genetic algorithm based on reinforcement learning for flexible job-shop scheduling problem[J]. Computers&Industrial Engineering,2020,149(1993):106778. [12] LI J Q,DU Y,GAO K Z,et al. A hybrid iterated greedy algorithm for a crane transportation flexible job shop problem[J]. IEEE Transactions on Automation Science and Engineering,2021,99:1-18. [13] 王凌,王晶晶.考虑运输时间的分布式绿色柔性作业车间调度协同群智能优化[J/OL].中国科学:技术科学:1-15[2022-04-16].http://kns.cnki.net/kcms/detail/11.5844.TH.20220408.1527.010.html.WANG Ling,WANG Jingjing. A cooperative memetic algorithm for the distributed green flexible job shop with transportation time[J/OL]. SCIENTIA SINICA Technologica:1-15[2022-04-16].http://kns.cnki.net/kcms/detail/11.5844.TH.20220408.1527.010.html. [14] 王亚昆,刘应波,吴永明,等.改进NSGA-II算法求解考虑运输约束的柔性作业车间节能调度问题[J/OL].计算机集成制造系统:1-22[2022-04-16].http://kns.cnki.net/kcms/detail/11.5946.tp.20210912.2002.004.html.WANG Yakun,LIU Yingbo,WU Yongming,et al.Improved NSGA-II algorithm to solve energy-saving scheduling problem of flexible job shop considering transportation constraints[J/OL]. Computer Integrated Manufacturing Systems:1-22[2022-04-16].http://kns.cnki.net/kcms/detail/11.5946.tp.20210912.2002.004.html. [15] 徐本柱,费晓璐,章兴玲.柔性作业车间批量划分与并行调度优化[J].计算机集成制造系统,2016,22(8):1953-1963.XU Benzhu, FEI Xiaolu, ZHANG Xingling. Batch division and parallel scheduling optimization of flexible job shop[J]. Computer Integrated Manufacturing Systems,2016,22(8):1953-1963. [16] LIU Y,TIWARI A. An investigation into minimising total energy consumption and total completion time in a flexible job shop for recycling carbon fiber reinforced polymer[J]. Procedia CIRP,2015,29:722-727. [17] 李聪波,雷焱绯,肖溱鸽,等.面向广义能耗的柔性作业车间调度优化模型[J].计算机集成制造系统,2018,24(12):3050-3059.LI Congbo,LEI Yanfei,XIAO Qinge,et al. Flexible job shop scheduling optimization model for generalized energy[J]. Computer Integrated Manufacturing Systems,2018,24(12):3050-3059. [18] 何彦,王乐祥,李育锋,等.一种面向机械车间柔性工艺路线的加工任务节能调度方法[J].机械工程学报,2016,52(19):168-179.HE Yan,WANG Lexiang,LI Yufeng,et al. A scheduling method for reducing energy consumption of machining job shops considering the flexible process plan[J]. Journal of Mechanical Engineering,2016,52(19):168-179. [19] 李聪波,朱岩涛,李丽,等.面向能量效率的数控铣削加工参数多目标优化模型[J].机械工程学报,2016,52(21):120-129.LI Congbo,ZHU Yantao,LI Li,et al. Multi-objective CNC milling parameters optimization model for energy efficiency[J]. Journal of Mechanical Engineering,2016,52(21):120-129. [20] 施金良,刘飞,许弟建,等.数控机床空载运行时节能决策模型及实用方法[J].中国机械工程,2009,20(11):1344-1346.SHI Jinliang,LIU Fei,XU Dijian,et al. Decision model and practical method of energy-saving in NC machine tool[J]. China Mechanical Engineering,2009,20(11):1344-1346. [21] 李聪波,沈欢,李玲玲,等.面向能耗的多工艺路线柔性作业车间分批优化调度模型[J].机械工程学报,2017,53(5):12-23.LI Congbo,SHEN Huan,LI Lingling,et al. A batch splitting flexible job shop scheduling model for energy saving under alternative process plans[J]. Journal of Mechanical Engineering,2017,53(5):12-23. [22] LI X Y,GAO L. An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem[J]. International Journal of Production Economics,2016,174:93-110. [23] GAO K Z,CAO Z G,ZHANG L,et al. A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems[J].IEEE/CAA Journal of Automatica Sinica,2019,6(4):904-916. [24] 张超勇,董星,王晓娟,等.基于改进非支配排序遗传算法的多目标柔性作业车间调度[J].机械工程学报,2010,46(11):159-163.ZHANG Chaoyong,DONG Xing,WANG Xiaojuan,et al. Improved NSGA-II for the multi-objective flexible job-shop scheduling problem[J]. Journal of Mechanical Engineering,2010,46(11):159-163. [25] 刘想德,张根保.柔性作业车间动态调度方法研究[J].机械设计与制造,2014,5:243-249.LIU Xiangde, ZHANG Genbao. Flexible job shop dynamic scheduling method research[J]. Machinery Design&Manufacture,2014,5:243-249. [26] 罗辞勇,陈民铀,张聪誉.采用循环拥挤排序策略的改进NSGA-II算法[J].控制与决策,2010,25(2):227-231.LUO Ciyong, CHEN Minyou, ZHANG Congyu.Improved NSGA-II algorithm with circular crowded sorting[J]. Control and Decision,2010,25(2):227-231. [27] 李益兵,黄炜星,吴锐.基于改进人工蜂群算法的多目标绿色柔性作业车间调度研究[J].中国机械工程,2020,31(11):1344-1350,1385.LI Yibing,HUANG Weixing,WU Rui. Research on multi-objective green flexible job-shop scheduling based on improved ABC algorithm[J]. China Mechanical Engineering,2020,31(11):1344-1350,1385. [28] MUSRRAT A,PATRICK S,MILLIE P. An efficient Differential Evolution based algorithm for solving multi-objective optimization problems[J]. European Journal of Operational Research,2011,217(2):404-416. [29] CARLOS A C C,NARELI C. Solving multiobjective optimization problems using an artificial immune system[J]. Genetic Programming and Evolvable Machines,2005,6(2):163-190. |