[1] 姚锡凡,张剑铭,陶韬,等. 从精敏制造到工业4.0长尾生产的制造业转型升级[J]. 计算机集成制造系统,2018,24(10):5-15. YAO Xifan,ZHANG Jianming,TAO Tao,et al. From leagile manufacturing to long-tail production in Industry 4.0 for upgrading manufacturing[J]. Computer Integrated Manufacturing Systems,2018,24(10):5-15. [2] LI G,ZENG B,LIAO W,et al. A new AGV scheduling algorithm based on harmony search for material transfer in a real-world manufacturing system[J]. Advances in Mechanical Engineering,2018,10(3):1687814018765560. [3] HE L J,LI W F,ZHANG Y,et al. A discrete multi-objective fireworks algorithm for flowshop scheduling with sequence-dependent setup times[J]. Swarm and Evolutionary Computation,2019,51:100575. [4] 贺利军,李文锋,张煜. 基于灰色综合关联分析的多目标优化方法[J]. 控制与决策,2020,35(5):1134-1142. HE Lijun,LI Wenfeng,ZHANG Yu. Multi-objective optimization method based on grey synthetic incidence analysis[J]. Control and Decision,2020,35(5):1134-1142. [5] QIAO F,MA Y,ZHOU M C,et al. A novel rescheduling method for dynamic semiconductor manufacturing systems[J]. IEEE Transactions on Systems,Man,and Cybernetics:Systems,2020,50(5):1679-1689. [6] VIEIRA G E,HERMANN J W,LIN A E. Rescheduling manufacturing systems:A framework of strategies,policies and methods[J]. Journal of Scheduling,2003,6:36-92. [7] GAO K,YANG F,ZHOU M C,et al.Flexible Job-Shop rescheduling for new job insertion by using discrete jaya algorithm[J]. IEEE Transactions on Cybernetics,2019,49(5):1944-1955. [8] AL-HINAI N,ELMEKAWY T Y. Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm[J]. International Journal of Production Economics,2011,132(2):279-291. [9] NOUIRI M,BEKRAR A,JEMAI A,et al. Two stage particle swarm optimizations to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns[J]. Computers & Industrial Engineering,2017,112(10):595-606. [10] SABUNCUOGLU I,GOREN S. Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research[J]. International Journal of Computer Integrated Manufacturing,2009,22(2):138-157. [11] GHEZAIL F,PIERREVAL H,HAJRI-GABOUJ S. Analysis of robustness in proactive scheduling:A graphical approach[J]. Computers & Industrial Engineering,2010,58(2):193-198. [12] ZHANG Y,WANG J,LIU S,et al. Game Theory based real-time shop floor scheduling strategy and method for cloud manufacturing[J]. International Journal of Intelligent Systems,2017,167(20):665-679. [13] WANG J,ZHANG Y,LIU Y,et al. Multi-agent and bargaining-game-based real-time scheduling for Internet of Things-enabled flexible job shop[J]. IEEE Internet of Things Journal,2019,6(2):2518-2531. [14] ZHANG Y F,GUO Z G,LV J,et al. A framework for smart production-logistics systems based on CPS and industrial IoT[J]. IEEE Transactions on Industrial Informatics,2018,14(9):4019-4032. [15] GUO Z G,ZHANG Y F,et al. A timed colored petri net simulation-based self-adaptive collaboration method for production-logistics systems[J]. Applied Sciences,2017,7(3):235. [16] QU T,LEI S P,WANG Z Z,et al. IoT-based real-time production logistics synchronization system under smart cloud manufacturing[J]. International Journal of Advanced Manufacturing Technology,2016,84:147-164. [17] LUO H,WANG K,KONG X T R,et al. Synchronized production and logistics via ubiquitous computing technology[J]. Robotics and Computer Integrated Manufacturing,2017,45(6):99-115. [18] EROL R,SAHIN C,BAYKASOGLU A,et al. A multi-agent-based approach to dynamic scheduling of machines and automated guided vehicles in manufacturing systems[J]. Applied Soft Computing,2012,12(6):1720-1732. [19] BARUWA O T,PIERA M A. A coloured Petri net-based hybrid heuristic search approach to simultaneous scheduling of machines and automated guided vehicles[J]. International Journal of Production Research,2016,54(16):4773-4792. [20] 施巍松,张星洲,王一帆,等. 边缘计算:现状与展望[J]. 计算机研究与发展,2019,56(1):69-89. SHI Weisong,ZHANG Xingzhou,WANG Yifan,et al. Edge computing:State-of-the-art and future directions[J]. Journal of Computer Research and Development,2019,56(1):69-89. [21] BILGE,UMIT,ULUSOY,et al. A time window approach to simultaneous scheduling of machines and material handling system in an FMS[J]. Operations Research,1995,43(6):1058-1070. |