[1] 谢志强,张晓欢,高一龙,等. 考虑串行工序紧密度的择时综合调度算法[J]. 机械工程学报,2018,54(6):191-202. XIE Zhiqiang,ZHANG Xiaohuan,GAO Yilong,et al. Time-selective integrated scheduling algorithm considering the compactness of serial processes[J]. Journal of Mechanical Engineering,2018,54(6):191-202. [2] JOHNSON S M. Optimal two- and three-stage production schedules with setup times included[J]. Naval Research Logistics Quarterly,1954,1(1):61-68. [3] LEI D. Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems[J]. International Journal of Advanced Manufacturing Technology,2008,37(1-2):157-165. [4] NAVAEI J,GHOMI S M T F,JOLAI F,et al. Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs[J]. Computers & Operations Research,2014,44(APR.):52-65. [5] WANG C,JIANG P. Deep neural networks based order completion time prediction by using real-time job shop RFID data[J]. Journal of Intelligent Manufacturing,2017(4):1-16. [6] FAN H L,XIONG H G,JIANG G Z,et al. Survey of the selection and evaluation for dispatching rules in dynamic job shop scheduling problem[C]//Proceedings of the Chinese Automation Congress,2016:1926-1931. [7] ZHAO F Q,ZOU J H,YANG Y H. A hybrid approach based on artificial neural network(ANN) and differential evolution(DE) for Job-Shop scheduling problem[J]. Applied Mechanics and Materials,2010,26-28:754-757. [8] 顾涛,李苏建,林莹璐,等. 周期式退火炉作批处理机的可重入批离散机流水车间调度[J]. 机械工程学报,2020,56(2):220-232. GU Tao,LI Sujian,LIN Yinglu,et al. Research on the re-entrant batch discrete flow shop scheduling for periodic annealing furnace as batch processor[J] Journal of Mechanical Engineering,2020,56(2):220-232. [9] 孙在省,钱斌,胡蓉,等. 基于块结构性质的花粉算法求解可重入作业车间调度问题[J]. 机械工程学报,2019,55(16):220-232. SUN Zaisheng,QIAN Bin,HU Rong,et al. Flower pollination algorithm based on block structure properties for reentrant Job-Shop scheduling problem[J]. Journal of Mechanical Engineering,2019,55(16):220-232. [10] 田云娜,李冬妮,郑丹,等. 一种基于时间窗的多阶段混合流水车间调度方法[J]. 机械工程学报,2016,52(16):185-196. TIAN Yunna,LI Dongni,ZHENG Dan,et al. A time window-based approach for multi-stage hybrid flow shop[J]. Journal of Mechanical Engineering,2016,52(16):185-196. [11] 赵诗奎. 基于新型邻域结构的混合算法求解作业车间调度[J]. 机械工程学报,2016,52(9):141-150. ZHAO Shikui. A hybrid algorithm with a new neighborhood structure for the Job Shop scheduling problem[J]. Journal of Mechanical Engineering,2016,52(9):141-150. [12] 赵诗奎. 求解柔性作业车间调度问题的两级邻域搜索混合算法[J]. 机械工程学报,2015,51(14):175-184. ZHAO Shikui. Bilevel neighborhood search hybrid algorithm for the flexible Job Shop scheduling problem[J]. Journal of Mechanical Engineering,2015,51(14):175-184. [13] 谢志强,张晓欢,辛宇,等. 考虑后续工序的择时综合调度算法[J]. 自动化学报,2018,44(2):344-362. XIE Zhiqiang,ZHANG Xiaohuan,XIN Yu,et al. Time-selective integrated scheduling algorithm considering posterior processes[J]. Acta Automatica Sinica,2018,44(2):344-362. [14] 谢志强,刘胜辉,乔佩利. 基于ACPM和BFSM的动态Job-Shop调度算法[J]. 计算机研究与发展,2003,40(7):977-983. XIE Zhiqiang,LIU Shenghui,QIAO Peili. Dynamic Job-Shop scheduling algorithm based on ACPM and BFSM[J]. Journal of Computer Research and Development,2003,40(7):977-983. [15] 谢志强,杨静,杨光,等.可动态生成优先具有优先级工序集的动态Job-Shop度算法[J].计算机学报,2008,31(3):502-508. XIE Zhiqiang,YANG Jing,YANG Guang,et al. Dynamic Job-Shop scheduling algorithm with dynamic set of operation having priority[J]. Chinese Journal of Computers,2008,31(3):502-508. [16] 谢志强,辛宇,杨静. 基于设备空闲事件驱动的综合调度算法[J]. 机械工程学报,2011,47(11):139-147. XIE Zhiqiang,XIN Yu,YANG Jing. Integrated scheduling algorithm based on event driven by machines' idle[J]. Journal of Mechanical Engineering,2011,47(11):139-147. [17] 谢志强,辛宇,杨静. 可回退抢占的设备驱动综合调度算法[J]. 自动化学报,2011,37(11):1332-1343. XIE Zhiqiang,XIN Yu,YANG Jing. Machine-driven integrated scheduling algorithm with rollback-preemptive[J]. Automatica Sinica,2011,37(11):1332-1343. [18] 谢志强,桂忠艳,杨静. 基于设备驱动和实质路径的动态并行综合柔性调度算法[J]. 机械工程学报,2014,50(18):203-212. XIE Zhiqiang,GUI Zhongyan,YANG Jing. Dynamic parallel integrated flexible scheduling algorithm based on device driver and essential path[J]. Journal of Mechanical Engineering,2014,50(18):203-212. |