[1] IEA. Tracking industrial energy efficiency and CO2 emissions[R]. Paris:OECD/IEA:2007.
[2] 刘飞,王秋莲,刘高君. 机械加工系统能量效率研究的内容体系及发展趋势[J]. 机械工程学报,2013,49(19):87-94. LIU Fei,WANG Qiulian,LIU Gaojun. Content architecture and future trends of energy efficiency research on machining systems[J]. Journal of Mechanical Engineering,2013,49(19):87-94.
[3] MOUZON G,YILDIRIM M B,TWOMEY J. Operational methods for minimization of energy consumption of manufacturing equipment[J]. International Journal of Production Research,2007,45(18-19):4247-4271.
[4] GUTOWSKI T G,BRANHAM M S,DAHMUS J B,et al. Thermodynamic analysis of resources used in manufacturing processes[J]. Environmental Science and Technology,2009,43(5):1584-1590.
[5] NEUGEBAUER R,WABNER M,RENTZSCH H,et al. Structure principles of energy efficient machine tools[J]. CIRP Journal of Manufacturing Science and Technology,2011,4(2):136-147.
[6] LI C,CHEN X,TANG Y,et al. Selection of optimum parameters in multi-pass face milling for maximum energy efficiency and minimum production cost[J]. Journal of Cleaner Production,2017,140(3):1805-1818.
[7] LI C,XIAO Q,TANG Y,et al. A method integrating Taguchi,RSM and MOPSO to CNC machining parameters optimization for energy saving[J]. Journal of Cleaner Production,2016,135:263-275.
[8] DAI M,TANG D,XU Y,et al. Energy-aware integrated process planning and scheduling for job shops[J]. Proceedings of the Institution of Mechanical Engineers,Part B:Journal of Engineering Manufacture,2014,229(Suppl.1):13-26.
[9] LIN W,YU D Y,ZHANG C,et al. A multi-objective teaching-learning-based optimization algorithm to scheduling in turning processes for minimizing makespan and carbon footprint[J]. Journal of Cleaner Production,2015,101:337-347.
[10] LI L,LI C,TANG Y,et al. An integrated approach of process planning and cutting parameter optimization for Energy-aware CNC Machining[J]. Journal of Cleaner Production,2017,162:458-473.
[11] 刘琼,周迎冬,张漪. 面向低碳的切削参数与调度集成优化[J]. 机械工程学报,2017,53(5):24-33. LIU Qiong,ZHOU Yingdong,ZHANG Yi. Integrated optimization of cutting parameters and scheduling for reducing carbon emissions[J]. Journal of Mechanical Engineering,2017,53(5):24-33.
[12] ÖZGÜVEN C,ÖZBAKIR L,YAVUZ Y. Mathematical models for job-shop scheduling problems with routing and process plan flexibility[J]. Applied Mathematical Modelling,2010,34(6):1539-1548.
[13] JIN L,TANG Q,ZHANG C,et al. More MILP models for integrated process planning and scheduling[J]. International Journal of Production Research,2016,54(14):1-16.
[14] WEI T,KHOSHNEVIS B. A linearized polynomial mixed integer programming model for the integration of process planning and scheduling[J]. Journal of Intelligent Manufacturing,2004,15(5):593-605.
[15] MANNE A S. On the job-shop scheduling problem[J]. Operations Research,1960,8(2):219-223.
[16] LI X,GAO L,SHAO X,et al. Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling[J]. Computers and Operations Research,2010,37(4):656-667.
[17] ZHANG Z,TANG R,PENG T,et al. A method for minimizing the energy consumption of machining system:Integration of process planning and scheduling[J]. Journal of Cleaner Production,2016,137:1647-1662.
[18] JIN L,ZHANG C,SHAO X,et al. A multi-objective memetic algorithm for integrated process planning and scheduling[J]. International Journal of Advanced Manufacturing Technology,2015,85(5):1-16.
[19] ZHANG C,JIANG P,ZHANG L,et al. Energy-aware integration of process planning and scheduling of advanced machining workshop[J]. Proceedings of the Institution of Mechanical Engineers,Part B:Journal of Engineering Manufacture,2015,231(11):2040-2055.
[20] JIN Liang,ZHANG Chaoyong,SHAO Xinyu. An effective hybrid honey bee mating optimization algorithm for integrated process planning and scheduling problems[J]. The International Journal of Advanced Manufacturing Technology,2015,80(5-8):1253-1264.
[21] UNLU Y,MASON S J. Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems[J]. Computers and Industrial Engineering,2010,58(4):785-800.
[22] NADERI B,GOHARI S,YAZDANI M. Hybrid flexible flowshop problems:Models and solution methods[J]. Applied Mathematical Modelling,2014,38(24):5767-5780.
[23] WANG S,LU X,LI X X,et al. A systematic approach of process planning and scheduling optimization for sustainable machining[J]. Journal of Cleaner Production,2015,87(1):914-929.
[24] HE Y,LIU B,ZHANG X,et al. A modeling method of task-oriented energy consumption for machining manufacturing system[J]. Journal of Cleaner Production,2012,23(1):167-174.
[25] 何彦,王乐祥,李育锋,等. 一种面向机械车间柔性工艺路线的加工任务节能调度方法[J]. 机械工程学报,2016,52(19):168-179. HE Yan,WANG Lexiang,LI Yufeng,et al. A scheduling method for reducing energy consumption of machining job shops considering the flexible process plan[J]. Journal of Mechanical Engineering,2016,52(19):168-179.
[26] 刘琼,梅侦. 面向低碳的工艺规划与车间调度集成优化[J]. 机械工程学报,2017,53(11):164-174. LIU Qiong,MEI Zhen. Integrated optimization of process planning and shop scheduling for reducing manufacturing carbon emissions[J]. Journal of Mechanical Engineering,2017,53(11):164-174.
[27] 李聪波,沈欢,李玲玲,等. 面向能耗的多工艺路线柔性作业车间分批优化调度模型[J]. 机械工程学报, 2017,53(5):12-23. LI Congbo,SHEN Huan,LI Lingling,et al. A batch splitting flexible job shop scheduling model for energy saving under alternative process plans[J]. Journal of Mechanical Engineering,2017,53(5):12-23.
[28] CHE A,WU X,PENG J,et al. Energy-efficient bi-objective single-machine scheduling with power-down mechanism[J]. Computers and Operations Research,2017,85:172-183.
[29] YILDIRIM M B,MOUZON G. Single-machine sustainable production planning to minimize total energy consumption and total completion time using a multiple objective genetic algorithm[J]. IEEE Transactions on Engineering Management,2012,59(4):585-597.
[30] LIU C,YANG J,LIAN J,et al. Sustainable performance oriented operational decision-making of single machine systems with deterministic product arrival time[J]. Journal of Cleaner Production,2014,85:318-330.
[31] LIANG P,YANG H,LIU G,et al. An Ant optimization model for unrelated parallel machine scheduling with energy consumption and total tardiness[J]. Mathematical Problems in Engineering,2015,2015:1-8.
[32] MAY G,STAHL B,TAISCH M,et al. Multi-objective genetic algorithm for energy-efficient job shop scheduling[J]. International Journal of Production Research,2015,53(23):7071-7089.
[33] ZHANG L,TANG Q,WU Z,et al. Mathematical modeling and evolutionary generation of rule sets for energy-efficient flexible job shops[J]. Energy,2017,138:210-227.
[34] WANG J,LI S,LIU J. A multi-granularity model for energy consumption simulation and control of discrete manufacturing system[C]//2012 IEEE 19th International Conference on Industrial Engineering and Engineering Management,October 27-29,2012,Changsha. Heidelberg:Springer,2012:1614-1618.
[35] MENG Leilei,ZHOU Mengchu,ZHANG Chaoyong,et al. A new model for predicting power consumption of machining processes:A turning case[C]//2016 IEEE International Conference on Automation Science and Engineering (CASE),August 21-25,2016,TX,Fort Worth. New York:IEEE,2016:1289-1294.
[36] WAGNER H M. An integer linear-programming model for machine scheduling[J]. Naval Research Logistics Quarterly,1959,6(2):131-140.
[37] CHAO-HSIENPAN. A study of integer programming formulations for scheduling problems[J]. International Journal of Systems Science,1997,28(1):33-41. |