[1] International Energy Agency. World energy outlook 2018[EB/OL]. http://www.iea.org/weo/,2018-09-18. [2] 李聪波,沈欢,李玲玲,等. 面向能耗的多工艺路线柔性作业车间分批优化调度模型[J]. 机械工程学报,2017,53(5):12-23.LI Congbo,SHEN Huan,LI Lingling,et al. A batch splitting flexible job shop scheduling model for energy saving under alternative process plans[J]. Journal of Mechanical Engineering,2017,53(5):12-23. [3] MENG Leilei,ZHANG Chaoyong,SHAO Xinyu,et al. MILP models for energy-aware flexible job shop scheduling problem[J]. Journal of Cleaner Production, 2018,188:710-723. [4] ZHANG Zhongwei,TANG Renzhong,PENG Tao,et al. A method for minimizing the energy consumption of machining system:Integration of process planning and scheduling[J]. Journal of Cleaner Production,2016,137:1647-1662. [5] WANG Han,JIANG Zhigang,WANG Yan,et al. A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization[J]. Journal of Cleaner Production,2018,188:575-588. [6] ZHANG Liping,TANG Qiuhua,WU Zhengjia,et al. Mathematical modeling and evolutionary generation of rule sets for energy-efficient flexible job shops[J].Energy,2017,138:210-227. [7] WANG Shijin,LIU Ming. Multi-objective optimization of parallel machine scheduling integrated with multi-resources preventive maintenance planning[J]. Journal of Manufacturing Systems,2015,37:182-192. [8] KHATAMI M,ZEGORDI S H. Coordinative production and maintenance scheduling problem with flexible maintenance time intervals[J]. International Journal of Advanced Manufacturing Technology,2017,28:857-867. [9] 吴秀丽,张志强,赵宁,等. 超启发式文化基因算法优化生产与预维修集成调度问题[J]. 计算机集成制造系统,2019,25(8):1885-1896.WU Xiuli,ZHANG Zhiqiang,ZHAO Ning,et al. Schedule production plan and preventive maintenance plan simultaneously with a hyper memetic algorithm[J]. Computer Integrated Manufacturing Systems,2019,25(8):1885-1896. [10] ZHOU Xiaojun,LU Biao. Preventive maintenance scheduling for serial multi-station manufacturing systems with interaction between station reliability and product quality[J]. Computers & Industrial Engineering,2018,122:283-291. [11] LU Zhiqiang,CUI Weiwei,HAN Xiaole. Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty[J]. Computers & Industrial Engineering,2015,80:236-244. [12] ZHOU Xiaojun,XI Lifeng,LEE J. Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation[J]. Reliability Engineering & System Safety,2007,92(4):530-534. [13] 刘繁茂. 面向故障过程的多设备可靠性分析与维修决策[D]. 武汉:华中科技大学,2010.LIU Fanmao. Reliability analysis and maintenance decision-making method of multi-machine for failure process[D]. Wuhan:Huazhong University of Science and Technology,2010. [14] 李聪波,朱岩涛,李丽,等. 面向能量效率的数控铣削加工参数多目标优化模型[J]. 机械工程学报,2016,52(21):130-137.LI Congbo,ZHU Yantao,LI Li,et al. Multi-objective optimization model for numerical control milling machining parameters for energy efficiency[J]. Journal of Mechanical Engineering,2016,52(21):130-137. [15] LI Lingling,LI Congbo,TANG Ying,et al. An integrated approach of process planning and cutting parameter optimization for energy-aware CNC machining[J]. Journal of Cleaner Production,2017,162:458-473. [16] ZARETALAB A,HAJIPOUR V,SHARIFI M,et al. A knowledge-based archive multi-objective simulated annealing algorithm to optimize series parallel system with choice of redundancy strategies[J]. Computers & Industrial Engineering,2015,80:33-44. |