[1] |
LUO Zhong, SHI Baolong, WU Fayong, LI Yuqi, LIU Kaining, ZHANG Xiaoxia.
Study on the Vibration Characteristics of Bolted Joint Rotor System Considering Assembly Technology
[J]. Journal of Mechanical Engineering, 2024, 60(8): 396-406.
|
[2] |
YU Weigang, WEN Sijie, LI Jianjun, LI Xinyu.
Affordance Reasoning-based Sequence Planning Manner for Human-robot Collaborative Disassembly
[J]. Journal of Mechanical Engineering, 2024, 60(17): 297-309.
|
[3] |
GUO Hongfei, CHEN Zhibin, REN Yaping, QU Ting, LI Jianqing.
Research on Disassembly Sequence and Disassembly Length Integrated Decision of End-of-life Products Based on Parts Recovery Comprehensive Evaluation
[J]. Journal of Mechanical Engineering, 2022, 58(4): 258-268.
|
[4] |
XU Zhijia, MO Shancong, TANG Wenbin.
Study on the Unified Intelligent Assembly Modeling and Sequence Planning based on Design Intent
[J]. Journal of Mechanical Engineering, 2021, 57(19): 208-217.
|
[5] |
YIN Fengfu, DU Zerui, LI Lin, LIANG Zhenning, AN Rui, WANG Ruidong, LIU Guangkuo.
Disassembly Sequence Planning of Used Smartphone Based on Dual-population Genetic Algorithm
[J]. Journal of Mechanical Engineering, 2021, 57(17): 226-235.
|
[6] |
CHEN Xianhua, MA Yaolu, GENG Yanfen, YANG Jun.
Research Progress of Vehicle-road Interaction in Pavement Engineering
[J]. Journal of Mechanical Engineering, 2021, 57(12): 18-30.
|
[7] |
LIU Xiaoyang, LIU Enfu, JIN Jiangyan.
Asynchronous Parallel Assembly Sequence Planning Based on Ant Colony Algorithm
[J]. Journal of Mechanical Engineering, 2019, 55(9): 107-119.
|
[8] |
ZOU Changwu, DENG Yimin, WANG Genhua.
Study on Functional Design and Function Switching Process of Adaptable-function Mechanical Products
[J]. Journal of Mechanical Engineering, 2016, 52(23): 62-68.
|
[9] |
YU Jiapeng, WANG Jianxi.
Automatic Generation of Hierarchical Exploded View Based on Recursive Iteration Method
[J]. Journal of Mechanical Engineering, 2016, 52(13): 175-188.
|
[10] |
ZHANG Wenlei, QU Rongxia, XU Meirong, LUO Xiaochuan.
Method for Automatic Generation of Assembly Interference Matrix of Complex Products
[J]. Journal of Mechanical Engineering, 2016, 52(1): 139-148.
|
[11] |
ZHAO Boxuan;LIU Jianhua;NING Ruxin;LIU Jiashun.
A Motion Planning Based on Selective Disassembly Sequence Planning Method
[J]. , 2014, 50(7): 136-145.
|
[12] |
ZENG Bing LI Mingfu;ZHANG Yi;MA Jianhua.
Research on Assembly Sequence Planning Based on Firefly Algorithm
[J]. , 2013, 49(11): 177-184.
|
[13] |
WANG Fengchan;SUN Youchao;LI Na.
Multi Station Assembly Sequence Planning Based on Particle Swarm Optimization Algorithm
[J]. , 2012, 48(9): 155-162.
|
[14] |
YU Jiapeng;WANG Chengen;WANG Jianxi.
Assembly Sequence Planning Based on Max-min Ant Colony System
[J]. , 2012, 48(23): 152-166.
|
[15] |
ZHAO Lei;LI Yuan;YU Jianfeng.
Assembly Sequence Concomitant Planning Method Based for the Variation of Constraint
[J]. , 2011, 47(5): 149-155.
|