LIU Jianjun, QIU Junhao, MO Chaoxiong, LAI Xinjun, CHEN Qingxin, MAO Ning. Rolling Scheduling of Distributed Multi-site Final-assembly Projects under Integrated Customization Requirements[J]. Journal of Mechanical Engineering, 2025, 61(6): 316-330.
[1] 莫超雄,刘建军,陈庆新,等. 集成化定制需求下多地总装作业过程敏捷协同管控系统[J]. 计算机集成制造系统,2021,27(11):3103-3119. MO Chaoxiong,LIU Jianjun,CHEN Qingxin,et al. Agile-collaborative management and control system for multi-site assembly process under integrated customization requirements[J]. Computer Integrated Manufacturing Systems,2021,27(11):3103-3119. [2] DING H,ZHUANG C,LIU J. Extensions of the resource- constrained project scheduling problem[J]. Automation in Construction,2023,153:104958. [3] HARTMANN S,BRISKORN D. An updated survey of variants and extensions of the resource-constrained project scheduling problem[J]. European Journal of Operational Research,2022,297(1):1-14. [4] TOSSELLI L,BOGADO V,MARTÍNEZ E. A repeated- negotiation game approach to distributed (re) scheduling of multiple projects using decoupled learning[J]. Simulation Modelling Practice and Theory,2020,98:101980. [5] 张锦,江丽,郭钧,等. 面向建材装备集团制造的分布式多项目资源调度[J]. 控制与决策,2021,36(9):2133-2142. ZHANG Jin,JIANG Li,GUO Jun,et al. Distributed multi- project resource scheduling oriented to manufacturing of building materials equipment group[J]. Control and Decision,2021,36(9):2133-2142. [6] ZHANG Z,CHEN M. A bi-level multi-agent system model for decentralized multi-project scheduling of wind power plants[J]. Journal of Renewable and Sustainable Energy,2018,10(3):035502. [7] 于懿宁,徐哲,刘东宁. 考虑多技能人力资源的分布式多项目调度问题[J]. 系统工程理论与实践,2020,40(11):2921-2933. YU Yining,XU Zhe,LIU Dongning. Distributed multi- project scheduling problem with multi-skilled staff[J]. System Engineering,2020,40(11):2921-2933. [8] CONFESSORE G,GIORDANI S,RISMONDO S. A market-based multi-agent system model for decentralized multi-project scheduling[J]. Annals of Operations Research,2007,150(1):115-135. [9] HOMBERGER J,FINK A. Generic negotiation mechanisms with side payments-Design,analysis and application for decentralized resource-constrained multi- project scheduling problems[J]. European Journal of Operational Research,2017,261(3):1001-1012. [10] SONG W,KANG D,ZHANG J,et al. A multi-unit combinatorial auction based approach for decentralized multi-project scheduling[J]. Autonomous Agents and Multi-Agent Systems,2017,31(6):1548-1577. [11] GONÇALVES J F,MENDES J J M,RESENDE M G C. A genetic algorithm for the resource constrained multi- project scheduling problem[J]. European Journal of Operational Research,2008,189(3):1171-1190. [12] LOVA A,TORMOS P. Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling[J]. Annals of Operations Research,2001,102(1):263-286. [13] BEŞIKCI U,BILGE Ü,ULUSOY G. Resource dedication problem in a multi-project environment[J]. Flexible Services and Manufacturing Journal,2013,25(1):206- 229. [14] 王磊,战德臣,聂兰顺. 基于市场机制的多项目分散式调度问题[J]. 计算机集成制造系统,2014,20(8):1969-1979. WANG Lei,ZHAN Dechen,NIE Lanshun. Multi-project decentralized scheduling problem solving by market mechanism[J]. Computer Integrated Manufacturing Systems,2014,20(8):1969-1979. [15] LIU S S,WANG C J. Resource-constrained construction project scheduling model for profit maximization considering cash flow[J]. Automation in Construction,2008,17(8):966-974. [16] LIU J,LU M. Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints[J]. Journal of Construction Engineering and Management,2018,144(7):04018049. [17] 王珩玮,林佳瑞,张建平. 考虑生产效率与工艺的资源受限项目调度问题[J]. 清华大学学报,2020,60(3):271-277. WANG Hengwei,LIN Jiarui,ZHANG Jianping. Resource-constrainted project scheduling problem considering productivity and construction methods[J]. Journal of Tsinghua University,2020,60(3):271-277. [18] MENESI W,HEGAZY T. Multimode resource- constrained scheduling and leveling for practical-size projects[J]. Journal of Management in Engineering,2015,31(6):04014092. [19] ZUO F,ZIO E,XU Y. Bi-objective optimization of the scheduling of risk-related resources for risk response[J]. Reliability Engineering & System Safety,2023,237:109391. [20] ARTIGUES C,LEUS R,NOBIBON F T. Robust optimization for resource-constrained project scheduling with uncertain activity durations[J]. Flexible Services and Manufacturing Journal,2013,25(1):175-205. [21] DEBLAERE F,DEMEULEMEESTER E,HERROELEN W. Proactive policies for the stochastic resource- constrained project scheduling problem[J]. European Journal of Operational Research,2011,214(2):308-316. [22] ROSTAMI S,CREEMERS S,LEUS R. New strategies for stochastic resource-constrained project scheduling[J]. Journal of Scheduling,2018,21(3):349-365. [23] 王凌,郑环宇,郑晓龙. 不确定资源受限项目调度研究综述[J]. 控制与决策,2014,29(4):577-584. WANG Ling,ZHENG Huanyu,ZHENG Xiaolong. Survey on resource-constrained project scheduling under uncertainty[J]. Control and Desion,2014,29(4):577-584.