| [1] |
AN Pengyu, ZHANG Yizhang, LIU Zhonghua, ZOU Dekun, ZHANG Xufang.
Uncertain Propagation and Analysis of Pipelines with Manufacturing Deviations
[J]. Journal of Mechanical Engineering, 2025, 61(16): 13-27.
|
| [2] |
LUO Zhong, SHI Baolong, WU Fayong, LI Yuqi, LIU Kaining, ZHANG Xiaoxia.
Study on the Vibration Characteristics of Bolted Joint Rotor System Considering Assembly Technology
[J]. Journal of Mechanical Engineering, 2024, 60(8): 396-406.
|
| [3] |
YU Weigang, WEN Sijie, LI Jianjun, LI Xinyu.
Affordance Reasoning-based Sequence Planning Manner for Human-robot Collaborative Disassembly
[J]. Journal of Mechanical Engineering, 2024, 60(17): 297-309.
|
| [4] |
GUO Hongfei, CHEN Zhibin, REN Yaping, QU Ting, LI Jianqing.
Research on Disassembly Sequence and Disassembly Length Integrated Decision of End-of-life Products Based on Parts Recovery Comprehensive Evaluation
[J]. Journal of Mechanical Engineering, 2022, 58(4): 258-268.
|
| [5] |
XU Zhijia, MO Shancong, TANG Wenbin.
Study on the Unified Intelligent Assembly Modeling and Sequence Planning based on Design Intent
[J]. Journal of Mechanical Engineering, 2021, 57(19): 208-217.
|
| [6] |
YIN Fengfu, DU Zerui, LI Lin, LIANG Zhenning, AN Rui, WANG Ruidong, LIU Guangkuo.
Disassembly Sequence Planning of Used Smartphone Based on Dual-population Genetic Algorithm
[J]. Journal of Mechanical Engineering, 2021, 57(17): 226-235.
|
| [7] |
LIU Xiaoyang, LIU Enfu, JIN Jiangyan.
Asynchronous Parallel Assembly Sequence Planning Based on Ant Colony Algorithm
[J]. Journal of Mechanical Engineering, 2019, 55(9): 107-119.
|
| [8] |
ZHAO Qiangqiang, HONG Jun, GUO Junkang, LIU Zhigang.
Deviation Propagation Analysis and Accuracy Modeling for Multi-closed-loop Mechanism
[J]. Journal of Mechanical Engineering, 2018, 54(21): 156-165.
|
| [9] |
ZOU Changwu, DENG Yimin, WANG Genhua.
Study on Functional Design and Function Switching Process of Adaptable-function Mechanical Products
[J]. Journal of Mechanical Engineering, 2016, 52(23): 62-68.
|
| [10] |
YU Jiapeng, WANG Jianxi.
Automatic Generation of Hierarchical Exploded View Based on Recursive Iteration Method
[J]. Journal of Mechanical Engineering, 2016, 52(13): 175-188.
|
| [11] |
ZHANG Wenlei, QU Rongxia, XU Meirong, LUO Xiaochuan.
Method for Automatic Generation of Assembly Interference Matrix of Complex Products
[J]. Journal of Mechanical Engineering, 2016, 52(1): 139-148.
|
| [12] |
ZHAO Boxuan;LIU Jianhua;NING Ruxin;LIU Jiashun.
A Motion Planning Based on Selective Disassembly Sequence Planning Method
[J]. , 2014, 50(7): 136-145.
|
| [13] |
ZENG Bing LI Mingfu;ZHANG Yi;MA Jianhua.
Research on Assembly Sequence Planning Based on Firefly Algorithm
[J]. , 2013, 49(11): 177-184.
|
| [14] |
WANG Fengchan;SUN Youchao;LI Na.
Multi Station Assembly Sequence Planning Based on Particle Swarm Optimization Algorithm
[J]. , 2012, 48(9): 155-162.
|
| [15] |
YU Jiapeng;WANG Chengen;WANG Jianxi.
Assembly Sequence Planning Based on Max-min Ant Colony System
[J]. , 2012, 48(23): 152-166.
|