[1] |
ZHANG Chao, ZHOU Guanghui, LI Jingjing, WEI Zhibo, QIN Tianyu.
Research on the Construction and Application of Digital Twin Process Model for Intelligent Process Planning of Aviation Complex Parts
[J]. Journal of Mechanical Engineering, 2024, 60(6): 32-43.
|
[2] |
WU Ke, ZHONG Zeyu, GAO Xuesong, YANG Donglei, WANG Jie, KONG Xiaohong, CHI Xiaoni.
Design and Implementation of Universal Multifunctional Flywheel Test System
[J]. Journal of Electrical Engineering, 2023, 18(2): 26-33.
|
[3] |
ZHANG Yu, LI Dongsheng, DONG Xiaoye, WANG Zhiwei, YANG Shuhua, GONG Yadong.
The Intelligent Macro-process Planning Based on an Improved BP Neural Network for STEP-NC 2.5D Manufacturing Features
[J]. Journal of Mechanical Engineering, 2020, 56(1): 148-156.
|
[4] |
GUO Feiyan, LIU Jianhua, ZOU Fang, ZHAI Yunong, WANG Zhongqi, LI Shaozhuo.
Research on the State-of-art, Connotation and Key Implementation Technology of Assembly Process Planning with Digital Twin
[J]. Journal of Mechanical Engineering, 2019, 55(17): 110-132.
|
[5] |
MENG Leilei, ZHANG Chaoyong, SHAO Xinyu, REN Yaping.
Mathematical Modeling of Energy-efficient Integration of Process Planning and Scheduling
[J]. Journal of Mechanical Engineering, 2019, 55(16): 185-196.
|
[6] |
LIU Qiong, MEI Zhen.
Integrated Optimization of Process Planning and Shop Scheduling For Reducing Manufacturing Carbon Emissions
[J]. Journal of Mechanical Engineering, 2017, 53(11): 164-174.
|
[7] |
Wan Qingzhu,Zhao Lei.
Research on Fault Location Expert System of Distribution Network Based on Transient Characteristics
[J]. Journal of Electrical Engineering, 2016, 11(11): 52-57.
|
[8] |
QIAO Lihong, ZHU Yixin, ANWER Nabil.
Geometric Enhanced Ontology Modeling for Assembly Process Planning
[J]. Journal of Mechanical Engineering, 2015, 51(22): 202-212.
|
[9] |
CHANG Zhiyong;YANG Jianxin;ZHAO Jie;WEI Haifeng.
Optimization of Process Based on Adaptive Ant Colony Algorithm
[J]. , 2012, 48(9): 163-169.
|
[10] |
ZHAO Lei;LI Yuan;YU Jianfeng.
Assembly Sequence Concomitant Planning Method Based for the Variation of Constraint
[J]. , 2011, 47(5): 149-155.
|
[11] |
DU Xuan;LI Zongbin.
Integrated Modeling and Optimization of Printed Circuit Board Assembly Process Planning and Scheduling
[J]. , 2011, 47(1): 152-160.
|
[12] |
JIANG Xingyu;WANG Shijie;ZHAO Kai;WANG Wanshan.
Intelligent Process Quality Control System for Networked Manufacturing
[J]. , 2010, 46(4): 186-194.
|
[13] |
DENG Zhaohui;ZHANG Xiaohong;CAO Defang;CAO Hui.
Process Expert System in NC Camshaft Grinding on the Basis of Rough Set and Case-based Reasoning
[J]. , 2010, 46(21): 178-186.
|
[14] |
LIU Yiwei;JIN Minghe;FAN Shaowei;LAN Tian;CHEN Zhaopeng.
Five-finger Dextrous Robot Hand DLR/HIT Hand II
[J]. , 2009, 45(11): 10-17.
|
[15] |
KONG Xiangzhen;JIANG Shouyong;LI Yongbin.
Intelligent Hybrid Control of the Pneumatic Proportional System
[J]. , 2009, 45(10): 84-88.
|