[1] LEE W, GROSH D L, TILLMAN F A, et al. Fault tree analysis, methods, and applications:A review[J]. Reliability, IEEE Transactions on. 1985, 34(3): 194-203. [2] 戚珩,李光,姜晨,等.基于贝叶斯网络的复杂系统多态可靠性分析[J].现代制造工程,2014(1):92-96. QI Heng, LI Guang, JIANG Chen, et al. Reliability analysis of multi-state system based on Bayesian networks[J]. Moder Manufacturing Engineering,2014(1):92-96. [3] TANAKA H, FAN L T, LAI F S, et al. Fault-tree analysis by fuzzy probability[J]. IEEE Transactions on Reliability,1983, 32(5):453-457. [4] SINGER D. A fuzzy set approach to fault tree and reliability analysis[J]. Fuzzy Sets and Systems, 1990, 34(2):145-155. [5] SURESH P V, BABAR A K, RAJ V V. Uncertainty in fault tree analysis:A fuzzy approach[J]. Fuzzy Sets and Systems, 1996, 83(2):135-141. [6] PAN H, YUN W. Fault tree analysis with fuzzy gates[J]. Computers & Industrial Engineering, 1997, 33(3):569-572. [7] LIN C, WANG M. Hybrid fault tree analysis using fuzzy sets[J]. Reliability Engineering and System Safety, 1997, 58(3):205-213. [8] 宋华,张洪钺,王行仁.T-S模糊故障树分析方法[J].控制与决策, 2005(8):854-859. SONG Hua, ZHANG Hongyue, WANG Xingren. Fuzzy fault tree analysis based on T-S model[J]. Control and Decision, 2005, 20(8):854-858. [9] 陈东宁,姚成玉.基于模糊贝叶斯网络的多态系统可靠性分析及在液压系统中的应用[J].机械工程学报, 2012,48(16):175-183. CHEN Dongning, YAO Chengyu. Reliability analysis of multi-state system based on fuzzy Bayesian networks and application in hydraulic system[J]. Journal of Mechanical Engineering, 2012, 48(16):175-183. [10] LAVASANI S M, ZENDEGANI A, CELIK M. An extension to fuzzy fault tree analysis (FFTA) application in petrochemical process industry[J]. Process Safety and Environmental Protection, 2015, 93:75-88. [11] SENOL Y E, AYDOGDU Y V, SAHIN B, et al. Fault tree analysis of chemical cargo contamination by using fuzzy approach[J]. Expert Systems with Applications, 2015, 42(12):5232-5244. [12] QI J, HU X, GAO X. Quantitative risk analysis of subsea pipeline and riser: an experts’ assessment approach using fuzzy fault tree[J]. International Journal of Reliability and Safety, 2014, 8(1):33-50. [13] 姚成玉,陈东宁,王斌.基于T-S故障树和贝叶斯网络的模糊可靠性评估方法[J].机械工程学报, 2014,50(2):193-201. YAO Chengyu, CHEN Dongning, WANG Bin. Fuzzy reliability assessment method based on T-S fault tree and Bayesian network[J]. Journal of Mechanical Engineering,2014,50(2):193-201. [14] 姚成玉,张荧驿,陈东宁,等.T-S模糊重要度分析方法研究[J].机械工程学报,2011,47(12):163-169. YAO Chengyu, ZHANG Yingyi, CHEN Dongning, et al. Research on T-S fuzzy importance analysis methods[J]. Journal of Mechanical Engineering, 2011, 47(12):163-169. [15] 唐宏宾,吴运新.基于T-S模糊故障树的混凝土泵车泵送液压系统故障诊断[J].计算机应用研究,2012(2):561-564. TANG Hongbin, WU Yunxin. Fault diagnosis of hydraulic system of concrete pump truck based on T-S fuzzy fault tree analysis[J]. Application Research of Computers,2012(2):561-564. [16] 陈东宁,姚成玉,党振.基于T-S模糊故障树和贝叶斯网络的多态液压系统可靠性分析[J].中国机械工程,2013(7):899-905. CHEN Dongning, YAO Chengyu, DANG Zhen. Reliability analysis of multi-state hydraulic system based on T-S fuzzy tree and Bayesian network[J]. China Mechanical Engineering,2013(7):899-905. |