[1] IJOMAH W L,CHILDE S J. A model of the operations concerned in remanufacture [J]. International Journal of Production Research,2007,45(24):5857-5880. [2] 朱胜,姚巨坤. 再制造设计理论及应用[M]. 北京:机械工业出版社,2009. ZHU Sheng,YAO Jukun. Design theories and applications of remanufacturing [M]. Beijing:China Machine Press,2009. [3] STEINHILPER R. Remanufacturing—the ultimate form of recycling [M]. Stuttgart:Fraunhofer IRB Verlag,1998. [4] TEUNTER R H,FLAPPER S D P. Optimal core acquisition and remanufacturing policies under uncertain core quality fractions [J]. European Journal of Operational Research,2011,210(2):241-248. [5] SOUZA G C,KETZENBERG M,GUIDE V D R. Capacitated remanufacturing with service level constraints [J]. Production and Operations Management,2002,11(2):231-248. [6] FERGUSON M,GUIDE V D R,KOCA E,et al. The value of quality grading in remanufacturing [J]. Production and Operations Management,2009,18(3):300-314. [7] GUIDE V D R. Production planning and control for remanufacturing:Industry practice and research needs [J]. Journal of Operations Management,2000,18(4):467-483. [8] MUKHOPADKYAY S K,MA H. Joint procurement and production decisions in remanufacturing under quality and demand uncertainty [J]. International Journal of Production Economics,2009,120(1):5-17. [9] GALBRETH M R,BLACKBURN J D. Optimal acquisition quantities in remanufacturing with condition uncertainty [J]. Production and Operations Management,2010,19(1):61-69. [10] 杨继荣,段广洪,向东.面向再制造工程的绿色模块化设计方法研究[J]. 中国表面工程,2006,19(5):67-70. YANG Jirong,DUAN Guanghong,XIANG Dong. The research on the method of the green modular design for remanufacture engineering [J]. China Surface Engineering,2006,19(5):67-70. [11] CHARTER M,GRAY C. Remanufacturing and product design [J]. International Journal of Product Development,2008,6(3-4):375-392. [12] HATCHER G D,IJOMAH W L,WINDMILL J F C. Integrating design for remanufacture into the design process:The operational factors [J]. Journal of Cleaner Production,2012,39:200-208. [13] SUNDIN E,LINDAHL M. Rethinking product design for remanufacturing to facilitate integrated product service offerings[C]// 2008 IEEE International Symposium on Electronics and the Environment,May 19-21,2008,San Francisco,CA,USA. New York:IEEE,2008:263-268. [14] PIGOSSO D C A,ZANETTE E T,FILHO A G,et al. Ecodesign methods focused on remanufacturing [J]. Journal of Cleaner Production,2010,18 (1):21-31. [15] ZWOLINSKI P,BRISSAUD D. Remanufacturing strategies to support product design and redesign [J]. Journal of Engineering Design,2008,19 (4):321-335. [16] 宋守许,刘明,柯庆镝,等. 基于强度冗余的零部件再制造优化设计方法[J]. 机械工程学报,2013,49(9):121-127. SONG Shouxu,LIU Ming,KE Qingdi,et al. Components optimization design for remanufacturing based on residual strength [J]. Journal of Mechanical Engineering,2013,49(9):121-127. [17] 刘艺. 发动机连杆剩余疲劳寿命预测及再制造可行性研究[D]. 济南:山东大学,2010. LIU Yi. Prediction for residual fatigue life of connecting rod and research on its remanufacturability [D]. Jinan:Shandong University,2010. |