Rock Breaking Force of Disc Cutters in Tunnel Boring Machine
ZHANG Zhaohuang1, CHENG Kefeng1, ZHUO Xingjian2, QUAN Xingyu1, JIA Lianhui2
1. School of Energy, Power and Mechanical Engineering, North China Electric Power University, Beijing 102206; 2. China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016
ZHANG Zhaohuang, CHENG Kefeng, ZHUO Xingjian, QUAN Xingyu, JIA Lianhui. Rock Breaking Force of Disc Cutters in Tunnel Boring Machine[J]. Journal of Mechanical Engineering, 2026, 62(11): 372-382.
[1] OZDEMIR L. Development of theoretical equations for predicting tunnel boreability[D]. Golden:Colorado School of Mines,1977. [2] BILGIN N,COPUR H,BALCI C. Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions[J]. Tunnelling and Underground Space Technology,2012,27(1):41-51. [3] AKIYAMA T. A theory of the rock-breaking function of the disc cutter[J]. Komatsu Technol,1970,16(3):56-61. [4] ROXBOROUGH F F,PHILLIPS H R. Rock excavation by disc cutter[J]. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts,1975,12(12):361-366. [5] 姜兴宇,高超,高伟贤,等. 基于库仑-莫尔准则的盘形滚刀破岩力预测研究[J]. 机械工程学报,2016,52(20):126-136. JIANG Xingyu,GAO Chao,GAO Weixian,et al. Research on prediction of rock-breaking force of disc cutter based on Coulomb-Mohr criterion[J]. Journal of Mechanical Engineering,2016,52(20):126-136. [6] 龚秋明,何冠文,赵晓豹,等. 不同贯入度对掘进机滚刀破岩效率的影响[J]. 现代隧道技术,2016,53(1):7. GONG Qiuming,HE Guanwen,ZHAO Xiaobao,et al. Influence of different penetrations on rock-breaking efficiency of tunneling machine cutters[J]. Modern Tunnelling Technology,2016,53(1):7. [7] 刘泉声,时凯,朱元广,等. TBM盘形滚刀破岩力计算模型研究[J]. 煤炭学报,2013,38(7):7. LIU Quansheng,SHI Kai,ZHU Yuanguang,et al. Research on calculation model of rock-breaking force of TBM disc cutter[J]. Journal of China Coal Society,2013,38(7):7. [8] HUO J,ZHU D,HOU N,et al. Application of a small-timescale fatigue,crack-growth model to the plane stress/strain transition in predicting the lifetime of a tunnel-boring-machine cutter head[J]. Engineering Failure Analysis,2017,71:11-30. [9] ZHANG X,HU D,LI J,et al. Investigation of rock breaking mechanism with TBM hob under traditional and free-face condition[J]. Engineering Fracture Mechanics,2021,242:107432. [10] 黄仟. 铁路隧道TBM破碎岩石机理及破岩力影响因素研究[J]. 江苏建筑职业技术学院学报,2024,24(1):26-31. HUANG Qian. Research on the mechanism of rock breaking by TBM in railway tunnels and influencing factors of rock - breaking force[J]. Journal of Jiangsu Jianzhu Institute of Technology,2024,24(1):26- 31. [11] 王召迁,王吉业,张志敏,等. 盘形滚刀破岩力影响因素试验研究[J]. 东北大学学报(自然科学版),2014,35(7):1015-1018. WANG Zhaoqian,WANG Jiye,ZHANG Zhimin,et al. Experimental study on influencing factors of rock-breaking force of disc cutters[J]. Journal of Northeastern University (Natural Science),2014,35(7):1015- 1018. [12] GERTSCH R,GERTSCH L,ROSTAMI J. Disc cutting tests in Colorado Red Granite:Implications for TBM performance prediction[J]. International Journal of Rock Mechanics and Mining Sciences,2007,44(2) :238-246. [13] BALCI C. Correlation of rock cutting tests with field performance of a TBM in a highly fractured rock formation:A case study in Kozyatagi-Kadikoy metro tunnel,Turkey[J]. Tunnelling and Underground Space Technology,2009,24(4):423-435. [14] CHO J W,JEON S,JEONG H Y,et al.Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting- machine testing and photogrammetric measurement[J]. Tunnelling and Underground Space Technology,2013,35( 4) :37-54. [15] 龚秋明,何冠文,赵晓豹,等. 掘进机刀盘滚刀间距对北山花岗岩破岩效率的影响实验研究[J]. 岩土工程学报,2015(1):54-60. GONG Qiuming,HE Guanwen,ZHAO Xiaobao,et al. Experimental study on the influence of cutter spacing of tunneling machine cutterhead on rock-breaking efficiency of Beishan granite[J]. Chinese Journal of Geotechnical Engineering,2015(1):54- 60. [16] SAMUEL A E,SEOW L,P. Disc force measurements on a full- face tunneling machine[J]. Int. J. Rock Mech. Min. Sci. &Geomech Abstr.,1984,21(2):83-96. [17] ROSTAMI J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure[M]. Golden:Colorado School of Mines,1997. [18] ROBBINS R J. Large diameter hard rock boring machines:State-of-the-art and development in view of alpine base tunnels [J]. Felsbau,1992,10(2):56-62. [19] GERTSCH R,GERTSCH L,ROSTAMI J. Disc cutting tests in Colorado Red Granite:Implications for TBM performance prediction[J]. International Journal of Rock Mechanics & Mining Sciences,2007,44(2):238-246. [20] 张魁,张玉林,郑学军,等. 基于空腔膨胀理论的TBM盘形滚刀侵岩载荷模型建模分析及试验验证[J]. 岩土工程学报,2022,44(12):2263-2271. ZHANG Kui,ZHANG Yulin,ZHENG Xuejun,et al. Modeling analysis and experimental verification of TBM disc cutter rock - penetration load model based on cavity expansion theory[J]. Chinese Journal of Geotechnical Engineering,2022,44(12):2263-2271. [21] YAN C,LUO Z,ZHENG Y,et al. A 2D discrete moisture diffusion model for simulating desiccation fracturing of soil[J]. Engineering Analysis with Boundary Elements,2022,138:42-64. [22] 闫利鹏. 硬岩地层下边缘滚刀安装倾角优化研究[J]. 四川建筑,2024,44(3):110-112. YAN Lipeng. Research on optimization of installation inclination angle of edge disc cutters in hard rock strata[J]. Sichuan Architecture,2024,44(3):110- 112. [23] 周亚来,詹金武,邵顺安,等. 盘形滚刀对TBM破岩效率的影响参数分析及优化设计[J]. 福建工程学院学报,2024,22(1):8-15. ZHOU Yalai,ZHAN Jinwu,SHAO Shunan,et al. Analysis of influence parameters of disc cutters on TBM rock-breaking efficiency and optimization design[J]. Journal of Fujian University of Technology,2024,22(1):8-15.