[1] TAO F,QI Q L,LIU A,et al. Data-driven smart manufacturing[J]. Journal of Manufacturing Systems,2018,48:157-169. [2] CUI Y S,KARA S,CHAN K C. Manufacturing big data ecosystem:A systematic literature review[J]. Robotics and Computer-Integrated Manufacturing,2020,62:101861. [3] 孟磊磊,张彪,任亚平,等. 求解分布式柔性作业车间调度的混合蛙跳算法[J]. 机械工程学报,2021,57(17):264-272. MENG Leilei,ZHANG Biao,REN Yaping,et al. Hybrid shuffled frog-leaping algorithm for distributed flexible job shop scheduling[J]. Journal of Mechanical Engineering,2021,57(17):264-272. [4] 吕阳,钱斌,胡蓉,等. 协同进化交叉熵算法求解浇次不固定的炼钢连铸调度问题[J]. 机械工程学报,2021,57(19):193-207. LÜ Yang,QIAN Bin,HU Rong,et al. Co-evolution cross-entropy optimization algorithm for cast uncertain steelmaking-continuous casting scheduling[J]. Journal of Mechanical Engineering. 2021,57(19):193-207. [5] WANG J,ZHANG Y F,LIU Y,et al. Multiagent and bargaining-game-based real-time scheduling for internet of things-enabled flexible job shop[J]. IEEE Internet of Things Journal,2018,6(2):2327-4662. [6] ZHOU Y,YANG J J,ZHENG L Y. Multi-agent based hyper-heuristics for multi-objective flexible job shop scheduling:A case study in an aero-engine blade manufacturing plan[J]. IEEE Access,2017,7:21147-21176. [7] 张泽群,唐敦兵,金永乔,等. 信息物联驱动下的离散车间自组织生产调度技术[J]. 机械工程学报,2018,54(16):35-44. ZHANG Zequn,TANG Dunbing,JIN Yongqiao,et al. Self-organizing production technology for discrete workshop scheduling driven by internet of things[J]. Journal of Mechanical Engineering,2018,54(16):35-44. [8] LIN C C,DENG D J,CHIH Y L,et al. Smart manufacturing scheduling with edge computing using multiclass deep Q network[J]. IEEE Transactions on Industrial Informatics,2019,15(7):4276-4284. [9] PARK J,CHUN J,KIM S H,et al. Learning to schedule job-shop problems:Representation and policy learning using graph neural network and reinforcement learning[J]. International Journal of Production Research,2021,59(11):3360-3377. [10] LIANG H G,WEN X Q,LIU Y K,et al. Logistics-involved QoS-aware service composition in cloud manufacturing with deep reinforcement learning[J]. Robotics and Computer-Integrated Manufacturing,2021,67:101991. [11] HU H,JIA X L,HE Q X,et al. Deep reinforcement learning based AGVs real-time scheduling with mixed rule for flexible shop floor in industry 4.0[J]. Computers & Industrial Engineering,2020,149:106749. [12] WANG J L,GAO P J,ZHENG P,et al. A fuzzy hierarchical reinforcement learning based scheduling method for semiconductor wafer manufacturing systems[J]. Journal of Manufacturing Systems,2021,61:239-248. [13] SHYALIKA C,SILVA T,KARUNANANDA A. Reinforcement learning in dynamic task scheduling:A review[J]. SN Computer Science,2020,1(6):1-17. [14] GRINSZTAJN N,BEAUMONT O,JEANNOT E,et al. READYS:A reinforcement learning based strategy for heterogeneous dynamic scheduling[C]//IEEE International Conference on Cluster Computing,2021,70-81. [15] PARK I B,HUH J,KIM J,et al. A reinforcement learning approach to robust scheduling of semiconductor manufacturing facilities[J]. IEEE Transactions on Automation Science and Engineering,2020,17(3):1420-1431. [16] LUO S. Dynamic scheduling for flexible job shop with new job insertions by deep reinforcement learning[J]. Applied Soft Computing,2020,91:106208. [17] MENG L L,ZHANG C Y,SHAO X Y,et al. More MILP models for hybrid flow shop scheduling problem and its extended problems[J]. International Journal of Production Research,2020,58(13):3905-3930. [18] SCHULMAN J,FILIP W,PRAFULLA D,et al. Proximal policy optimization algorithms[J]. 2017,arXiv:1707.06347. [19] BERGSTRA J,BENGIO Y. Random search for hyper-parameter optimization[J]. Journal of Machine Learning Research,2012,13(1):281-305. |