Study of the Reliability of Actuator Group System for FAST
LEI Zheng1,2,3, JIANG Peng1,3, WANG Qiming1,3, YAO Rui1,3, ZHU Ming1,3
1. National Astronomical Observatory, Chinese Academy of Sciences, Beijing 100101; 2. School of Astronomy and Space Science, University of Chinese Academy of Sciences, Beijing 101408; 3. CAS Key Laboratory of FAST, National Astronomical Observatory, Chinese Academy of Sciences, Beijing 100101
LEI Zheng, JIANG Peng, WANG Qiming, YAO Rui, ZHU Ming. Study of the Reliability of Actuator Group System for FAST[J]. Journal of Mechanical Engineering, 2022, 58(6): 289-294.
[1] 李爱华,周国华,李国平,等. 射电望远镜主动反射面系统的控制[J]. 光学精密工程,2016,24(7):1711-1718. LI Aihua,ZHOU Guohua,LI Guoping,et al. Control of active reflector system for radio telescope[J]. Optics and Precision Engineering,2016,24(7):1711-1718. [2] 南仁东. 500m球反射面射电望远镜FAST[J]. 中国科学G辑,物理学,力学,天文学,2005,35(5):449-466. NAN Rendong. Five hundred meter aperture spherical radio telescope (FAST) [J]. Science in China:Series G:Physics Mechanics& Astronomy,2005,35(5):449-466. [3] 李庆伟,姜鹏,南仁东. 500m口径射电望远镜索网与面板单元自适应连接机构设计分析[J]. 机械工程学报,2017,53(7):62-68. LI Qingwei,JANG Peng,NAN Rendong. Design and analysis of the adaptive connecting mechanism between the cable-net and panel of five-hundred-meter aperture spherical radio telescope[J]. Chinese Journal of Mechanical Engineering,2017,53(7):62-68. [4] 雷政,王启明,甘恒谦,等. FAST液压促动器过滤系统[J]. 机械工程学报,2020,56(4):218-223. LEI Zheng,WANG Qiming,GAN Hengqian,et al. Filtration system for hydraulic actuators of FAST[J]. Chinese Journal of Mechanical Engineering,2020,56(4):218-223. [5] ZHU Ming,WANG Qiming,LEI Zheng,et al. Research for reliability of the actuator of FAST reflector based on FMECA[J]. International Conference on Reliability,2015,1(1):623-627. [6] CAI Wei,ZHAO Jingyi,ZHU Ming. A real time methodology of cluster-system theory-based reliability estimation using k-means clustering[J]. Reliability Engineering and System Safety,2020(202):107045. [7] 赵静一,姚成玉. 液压系统可靠性工程[M]. 北京:机械工业出版社,2011. ZHAO Jingyi,YAO Chengyu. Reliability engineering of hydraulic system[M]. Beijing:China Machine Press,2011 [8] 周源泉. 论AMSAA-BISE模型——兼答梅文华[J]. 应用数学和力学,2001,22(7):763-767. ZHOU Yuanquan. Discussion model of AMSAA-BISE and answer for MEI Wenhua[J]. Applied Mathematics and Mechanics,2001,22(7):763-767. [9] IEC 1164. Reliability growth statistical test and estimation methods[S]. New York:US-ANSI,2004. [10] 柴振海,乔梁,史宪铭. 自行火炮可靠性增长理论与技术[M]. 北京:国防工业出版社,2017. CHAI Zhenhai,QIAO Liang,SHI Xianming. Theory and technology of reliability growth for self-propelled artillery [M]. Beijing:National Defense Industry Press,2017 [11] 吕琛,马剑,王自力. PHM技术国内外发展情况综述[J]. 计算机测量与控制,2016,24(9):1-4. LÜ Chen,MA Jian,WANG Zili. A state of the art review on PHM technology[J]. Computer Measurement & Control,2016,24(9):1-4. [12] 年夫顺. 关于故障预测与健康管理技术的几点认识[J]. 仪器仪表学报,2018,39(8):1-14. NIAN Fushun. Viewpoints about the prognostic and health management[J]. Chinese Journal of Scientific Instrument,2018,39(8):1-14.