Journal of Mechanical Engineering ›› 2026, Vol. 62 ›› Issue (11): 61-75.doi: 10.3901/JME.260589
WANG Junkai1, YAN Guichen1, YOU Shiqi1, WANG Haixuan1, ZHANG Peng1, QIAO Fei1, WANG Lihui2
Received:2025-06-05
Revised:2025-11-06
Published:2026-07-29
CLC Number:
WANG Junkai, YAN Guichen, YOU Shiqi, WANG Haixuan, ZHANG Peng, QIAO Fei, WANG Lihui. Indicator System and Evaluation Decision-making for Sustainable Manufacturing Scheduling Based on ProdSI-FANP[J]. Journal of Mechanical Engineering, 2026, 62(11): 61-75.
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
| [1] 姚锡凡,景轩,周佳军,等. 走向新一代可持续制造—— 包容性制造[J]. 计算机集成制造系统,2019,25(10): 2419-2432. YAO Xifan,JING Xuan,ZHOU Jiajun,et al. Towards a new generation of sustainable manufacturing:Inclusive manufacturing[J]. Computer Integrated Manufacturing Systems,2019,25(10):2419-2432. [2] TATICCHI P,TONELLI F,PASQUALINO R. Performance measurement of sustainable supply chains[J]. International Journal of Productivity and Performance Management,2013,62(8):782-804. [3] 李洪丞,曹华军,刘兰微,等. 碳达峰碳中和背景下低碳制造研究现状与技术路径研究[J]. 机械工程学报,2023,59(7):225-240. LI Hongcheng,CAO Huajun,LIU Lanwei,et al. Research status and technology path of low-carbon manufacturing under the background of carbon peak and carbon neutrality[J]. Journal of Mechanical Engineering,2023,59(7):225-240. [4] 张辰源,陶飞. 数字孪生模型评价指标体系[J]. 计算机集成制造系统,2021,27(8):2171-2186. ZHANG Chenyuan,TAO Fei. Evaluation index system for digital twin model[J]. Computer Integrated Manufacturing Systems,2021,27(8):2171-2186. [5] 王婕,耿秀丽. 基于直觉模糊余弦相似度的云制造服务质量评价[J]. 计算机集成制造系统,2021,27(4):1128-1134. WANG Jie,GENG Xiuli. Evaluation of cloud manufacturing service quality based on intuitionistic fuzzy cosine similarity[J]. Computer Integrated Manufacturing Systems,2021,27(4):1128-1134. [6] ABEDINI A,LI W,BADURDEEN F,et al. A metric- based framework for sustainable production scheduling[J]. Journal of Manufacturing Systems,2020,54:174–185. [7] 石小秋,李炎炎,邓丁山,等. 基于自适应变级遗传杂草算法的FJSP研究[J]. 机械工程学报,2019,55(6):223-232. SHI Xiaoqiu,LI Yanyan,DENG Dingshan,et al. Research on FJSP based on adaptive graded genetic weed algorithm[J]. Journal of Mechanical Engineering,2019,55(6):223-232. [8] 苏建涛,董绍华,朱诗敏. 多目标混合流水车间机器故障重调度问题研究[J]. 机械工程学报,2024,60(4):438-448. SU Jiantao,DONG Shaohua,ZHU Shimin. Research on machine fault rescheduling problem in multi-objective mixed flow workshop[J]. Journal of Mechanical Engineering,2024,60(4):438-448. [9] LU T. A metrics-based sustainability assessment of cryogenic machining using modeling and optimization of process performance[D]. Lexington:University of Kentucky,2014. [10] HAPUWATTE B M,BADURDEEN F,JAWAHIR I S. Metrics-based integrated predictive performance models for optimized sustainable product design[J]. Sustainable Design and Manufacturing,2017,68:25-34. [11] HUANG A,BADURDEEN F. Metrics-based approach to evaluate sustainable manufacturing performance at the production line and plant levels[J]. Journal of Cleaner Production,2018,192:462-476. [12] MASTROCINQUE E,RAMÍREZ F J,HONRUBIA- ESCRIBANO A,et al. An AHP-based multi-criteria model for sustainable supply chain development in the renewable energy sector[J]. Expert Systems with Applications,2020,150:1-17. [13] LIN G,ZHANG Q,ZHANG Y,et al. Performance assessment of public transport networks:An AHP-ANP approach[J]. Heliyon,2024,10(22):e40309. [14] 孔琳,王黎明,吕晓腾,等. 基于多层级约束满足问题的产品全生命周期设计方案决策研究[J]. 机械工程学报,2023,59(11):276-289. KONG Lin,WANG Liming,LÜ Xiaoteng,et al. Research on product life cycle design decision based on multi-level constraint satisfaction problem[J]. Journal of Mechanical Engineering,2023,59(11):276-289. [15] 刘玲,何玉洁,夏露,等. 基于直觉模糊环境下汽车行业的绿色供应商选择研究[J]. 物流工程与管理,2023,45(1):1-5. LIU Ling,HE Yujie,XIA Lu,et al. Research on green supplier selection in automotive industry based on intuitionistic ambiguity environment[J]. Logistics Engineering and Management,2023,45(1):1-5. [16] 吕淑然,田琦. 基于DEMATEL-ANP-GRA的大型泵站运行安全综合评价[J]. 安全与环境学报,2022,22(4):1729-1735. LÜ Shuran,TIAN Qi. Comprehensive evaluation of operation safety of large pumping station based on DEMATEL-ANP-GRA[J]. Journal of Safety and Environment,2022,22(4):1729-1735. [17] 李达,张普琛,林倪,等. 基于多模型耦合的电动汽车三电系统安全性估计方法[J]. 机械工程学报,2023,59(12):354-363. LI Da,ZHANG Puchen,LIN Ni,et al. Safety estimation method of electric vehicle three-electric system based on multi-model coupling[J]. Journal of Mechanical Engineering,2023,59(12):354-363. [18] NIU Q,ZHOU T,MA S,A quantum-inspired immune algorithm for hybrid flow shop with makespan criterion[J]. Journal of Universal Computer Science,2009,15(4):765-785. [19] GONG G L,CHIONG R,DENG Q W,et al. Energy-efficient flexible flow shop scheduling with worker flexibility[J]. Expert Systems with Applications,2020,141:112902. [20] WANG S,LU Y. A branch and price algorithm for single-machine completion time variance[J]. Computers and Operations Research,2019,109:188-199. [21] WANG X,LI Z,CHEN Q,et al. Meta-heuristics for unrelated parallel machines scheduling with random rework to minimize expected total weighted tardiness[J]. Computers and Industrial Engineering,2020,145(100):106505. [22] WANG J,WANG L. A cooperative memetic algorithm with feedback for the energy-aware distributed flow-shops with flexible assembly scheduling[J]. Computers & Industrial Engineering,2022,168:108126. [23] SHAO W,SHAO Z,PI D. A network memetic algorithm for energy and labor-aware distributed heterogeneous hybrid flow shop scheduling problem[J]. Swarm and Evolutionary Computation,2022,75:101190. [24] KHARE A,AGRAWAL S. Scheduling hybrid flowshop with sequence-dependent setup times and due windows to minimize total weighted earliness and tardiness[J]. Computers and Industrial Engineering,2019,135:780-792. [25] KOUIDER A,BOUZOUIA B. Multi-agent job shop scheduling system based on co-operative approach of idle time minimisation[J]. International Journal of Production Research,2012,50(2):409-424. [26] ZHU H,DENG Q,ZHANG L,et al. Low carbon flexible job shop scheduling problem considering worker learning using a memetic algorithm[J]. Optimization and Engineering,2020,21(4):1691-1716. [27] GONG G,DENG Q,CHIONG R,et al. Remanufacturing- oriented process planning and scheduling:Mathematical modelling and evolutionary optimization[J]. International Journal of Production Research,2020,58(12):3781-3799. [28] GONG X,DE PESSEMIER T,MARTENS L,et al. Energy-and labor-aware flexible job shop scheduling under dynamic electricity pricing:A many-objective optimization investigation[J]. Journal of Cleaner Production,2019,209:1078-1094. [29] MOKHTARI H,HASANI A. An energy-efficient multi- objective optimization for flexible job-shop scheduling problem[J]. Computers and Chemical Engineering,2017,104:339-352. [30] SHEIKHALISHAHI M,ESKANDARI N,MASHAYEKHI A,et al. Multi-objective open shop scheduling by considering human error and preventive maintenance[J]. Applied Mathematical Modelling,2019,67:573-587. [31] GONG X,DENG Q,GONG G,et al. A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility[J]. International Journal of Production Research,2018,56(7):2506-2522. [32] HONMA S,HU J L. Cost efficiency of recycling and waste disposal in Japan[J]. Journal of Cleaner Production,2020,284:125274. [33] FAZLOLLAHTABAR H,MAHDAVI I,ASHOORI M T,et al. A multi-objective decision-making process of supplier selection and order allocation for multi-period scheduling in an electronic market[J]. International Journal of Advanced Manufacturing Technology,2011,52(9-12):1039-1052. [34] WANG S,MASON S J,GANGAMMANAVAR H. Stochastic optimization for flow-shop scheduling with on-site renewable energy generation using a case in the United States[J]. Computers and Industrial Engineering,2020,149:106812. [35] ZANDI A,RAMEZANIAN R,MONPLAISIR L. Green parallel machines scheduling problem:A bi-objective model and a heuristic algorithm to obtain Pareto frontier[J]. Journal of the Operational Research Society,2020,71(6):967-978. [36] YIN L,LI X,GAO L,LU C,et al. A novel mathematical model and multi-objective method for the low-carbon flexible job shop scheduling problem[J]. Sustainable Computing:Informatics and Systems,2017,13:15-30. [37] GUO H,TAN J,LIAO S,et al. Exploring the spatial aggregation and determinants of energy intensity in Guangdong province of China[J]. Journal of Cleaner Production,2021,282:124367. [38] LUAN B,ZOU H,CHEN S,et al. The effect of industrial structure adjustment on China’s energy intensity:Evidence from linear and nonlinear analysis[J]. Energy,2021,218:119517. [39] MALINAUSKAITE J,JOUHARA H,EGILEGOR B,et al. Energy efficiency in the industrial sector in the EU,Slovenia,and Spain[J]. Energy,2020,208:118398. [40] PULLURU S J,AKKERMAN R. Water-integrated scheduling of batch process plants:Modelling approach and application in technology selection[J]. European Journal of Operational Research,2018,269(1):227-243. [41] VÁSQUEZ-LAVÍN F,VARGAS O L,HERNÁNDEZ J I,et al. Water demand in the Chilean manufacturing industry:Analysis of the economic value of water and demand elasticities[J]. Water Resources and Economics,2020,32:100159. [42] PULLURU S J,AKKERMAN R. Data-driven water- efficient production scheduling in the food industry[J]. Computer Aided Chemical Engineering. 2018,43:1063-1068. [43] ADEKOLA O,MAJOZI T. Wastewater minimization in batch plants with sequence dependent changeover[J]. Computers & Chemical Engineering,2017,97:85-103. [44] TAN H X,YEO Z,NG R,et al. A sustainability indicator framework for Singapore small and medium-sized manufacturing enterprises[J]. Procedia CIRP,2015,29:132-137. [45] CAO J,PAN R,XIA X,et al. An efficient scheduling approach for an iron-steel plant equipped with self- generation equipment under time-of-use electricity tariffs[J]. Swarm and Evolutionary Computation,2021,60:100764. [46] IVERSEN E B,MORALES J M,MØLLER J K,et al. Short-term probabilistic forecasting of wind speed using stochastic differential equations[J]. International Journal of Forecasting,2016,32(3):981-990. [47] PIROOZFARD H,WONG K Y,WONG W P. Minimizing total carbon footprint and total late work criterion in flexible job shop scheduling by using an improved multi- objective genetic algorithm[J]. Resources,Conservation and Recycling,2018,128:267-283. [48] WANG J,YAO S,SHENG J C,et al. Minimizing total carbon emissions in an integrated machine scheduling and vehicle routing problem[J]. Journal of Cleaner Production,2019,229:1004-1017. [49] MENG X M. Recognition of toxic gases emission in power plant based on artificial neural network[J]. Energy Procedia,2012,17:1578-1584. [50] LIU C,GAO M,ZHU G,et al. Data driven eco-efficiency evaluation and optimization in industrial production[J]. Energy,2021,224:120170. [51] KERDSIRI S,ARAMKUL S,CHAMPRASERT P. Fatigue consideration optimization model for employee allocation in flow shop scheduling problems[C]//2019 IEEE 6th International Conference on Industrial Engineering and Applications (ICIEA). IEEE,2019:898-902. [52] DEMESURE G,CHARPENTIER P,SIADAT A,et al. Jobs scheduling within Industry 4.0 with consideration of worker's fatigue and reliability using greedy randomized adaptive search procedure[J]. IFAC PapersOnLine,2019,52(19):85-90. [53] RUIZ-TORRES A J,ABLANEDO-ROSAS J H,MUKHOPADHYAY S,et al. Scheduling workers:A multi-criteria model considering their satisfaction[J]. Computers and Industrial Engineering,2019,128:747-754. [54] LIU M,LIU X. Satisfaction-driven bi-objective multi-skill workforce scheduling problem[J]. IFAC PapersOnLine,2019,52(13):229-234. [55] GENG K,YE C,LIU L. Research on multi-objective hybrid flow shop scheduling problem with dual resource constraints using improved memetic algorithm[J]. IEEE Access,2020,8:104527-104542. [56] ZHANG Z,TANG Q H,RUIZ R,et al. Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem:A multi-objective approach[J]. Computers and Operations Research,2020,118:104905. [57] LIAN J,LIU C G,LI W J,et al. A multi-skilled worker assignment problem in seru production systems considering the worker heterogeneity[J]. Computers and Industrial Engineering,2018,118:366-382. [58] WU Y,ZENG S,YU Y. Modelling and a hybrid genetic algorithm for the equity-oriented worker assignment problem in seru production systems[J]. Journal of Industrial and Management Optimization,2024,20(1):36-58. [59] LEE Y H. The workload assignment problem in consideration of the worker pairing and the workload balancing[J]. Industrial Engineers Interfaces,2009,22(3):263-277. [60] BOENZI F,DIGIESI S,MOSSA G,et al. Modelling workforce aging in job rotation problems[J]. IFAC-PapersOnLine,2015,48(3):604-609. [61] SOBHANI A,WAHAB M I M,NEUMANN W P. Incorporating human factors-related performance variation in optimizing a serial system[J]. European Journal of Operational Research,2017,257(1):69-83. [62] LU C,GAO L,LI X,et al. A multi-objective approach to welding shop scheduling for makespan,noise pollution and energy consumption[J]. Journal of Cleaner Production,2018,196:773-787. [63] FU Y,TIAN G,FATHOLLAHI-FARD A M,et al. Stochastic multi-objective modelling and optimization of an energy-conscious distributed permutation flow shop scheduling problem with the total tardiness constraint[J]. Journal of Cleaner Production,2019,226:515-525. [64] LIAO W,FU Y. Min–max regret criterion-based robust model for the permutation flow-shop scheduling problem[J]. Engineering Optimization,2020,52(4):687-700. |
| [1] | YANG Zehao, DONG Wei, HUANG Sihan, YIN Yanchao, DONG Liyang, ZHENG Zujie. Real-time Scheduling Simulation Optimization Method for Smart Production Lines Based on Digital Twin and Reinforcement Learning [J]. Journal of Mechanical Engineering, 2026, 62(5): 12-25. |
| [2] | QIAO Fei, LIU Juan, WANG Dongyuan, DING Chen, SHI Jiaxuan, WANG Juankai, MA Yumin. Human-centric Integration Technology for Production Scheduling in Industry 5.0 [J]. Journal of Mechanical Engineering, 2025, 61(15): 40-56. |
| [3] | JING Liting, CHEN Yingchen, XIE Jing, TAN Bowen, JIANG Shaofei. Research on the Evaluation of Product Sustainable Design Demands Considering the Inconsistency of Users’ Weights and Complex Interaction [J]. Journal of Mechanical Engineering, 2023, 59(3): 218-231. |
| [4] | LIU Qiong, LIU Jiahao, LIU Jialiang. Integrated Optimization of Preventive Maintenance and Flexible Job Shop Group Scheduling Based on an ABC-AN Algorithm [J]. Journal of Mechanical Engineering, 2023, 59(12): 89-96. |
| [5] | HUANG Zuguang, WANG Shuhui, WANG Jinjiang, ZHANG Fengli. Research on Comprehensive Evaluation Method of CNC Machine Tools Based on RAMS [J]. Journal of Mechanical Engineering, 2022, 58(9): 218-230. |
| [6] | GU Tao, LI Sujian, LIN Yinglu, WU Xiuli. Research on the Re-entrant Batch Discrete Flow Shop Scheduling for Periodic Annealing Furnace as Batch Processor [J]. Journal of Mechanical Engineering, 2020, 56(2): 220-232. |
| [7] | JIANG Renyan. In-service Quality Indices and Performance Evaluation Indicator System of Engineered Systems: Literature Review [J]. Journal of Mechanical Engineering, 2019, 55(18): 206-214. |
| [8] | ZHANG Cheng, LIU Zhifeng, YANG Kai, ZHANG Weiwei, BAO Hong. Recognition for Optimization Potential on Product Environmental Performances [J]. Journal of Mechanical Engineering, 2017, 53(7): 145-153. |
| [9] | LI Congbo;LIU Fei;YI Qian;LI Chengchuan. A Critical Chain Based Uncertain Production Scheduling Method for Remanufacturing Systems [J]. , 2011, 47(15): 121-126. |
| [10] | SU Zilin. Job-shop Scheduling Problem and Its Evolution Algorithm Analysis [J]. , 2008, 44(8): 242-247. |
| [11] | ZHANG Jie;WANG Wei;FANG Haisong;CHENG Yang. DOUBLE-FEEDBACK AND PHASES BASED SCHEDULING FOR FIRER PRODUCTION [J]. , 2006, 42(11): 125-130. |
| [12] | ZHOU Yaqin;LI Beizhi;YANG Jianguo. INTELLIGENT SCHEDULING ALGORITHM FOR PROBLEMS WITH BATCH AND NON CUTTING TIME [J]. , 2006, 42(1): 52-56. |
| [13] | Ying Baosheng;Dan Binbin;Zhang Hua. OPTIMIZATION MODEL BY INTEGRATING PREVENTIVE MAINTENANCE PLANNING AND PRODUCTION SCHEDULING [J]. , 2005, 41(3): 226-228. |
| [14] | Wang Yiqun;Yin Guofang;Sun Xuguang. RESEARCH FOR ATTERN RECOGNITION OF SHAPE SIGNAL METHOD [J]. , 2003, 39(8): 91-94. |
| [15] | Li Haolin. ALGORITHM OF FMS PRODUCTION SCHEDULING BASED ON GENETIC ALGORITHM [J]. , 2000, 36(9): 91-93. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||
