Lot Streaming Flexible Job-shop Scheduling with Pre-maintenance
WANG Yufang1,2,3, HUA Xiaolin1, ZHANG Dianqing1, LIU Pingying1
1. School of Automation, Nanjing University of Information Science & Technology, Nanjing 210044; 2. Jiangsu Collaborative Innovation Center of Atmospheric Environment and Equipment Technology, Nanjing University of Information Science & Technology, Nanjing 210044; 3. Jiangsu Engineering Research Center on Meteorological Energy Using and Control, Nanjing University of Information Science & Technology, Nanjing 210044
WANG Yufang, HUA Xiaolin, ZHANG Dianqing, LIU Pingying. Lot Streaming Flexible Job-shop Scheduling with Pre-maintenance[J]. Journal of Mechanical Engineering, 2026, 62(15): 244-261.
[1] 梁志珍,王晓佳. 双资源约束的柔性作业车间鲁棒调度方法[J]. 机械工程学报,2024,60(6):114-126. LIANG Zhizhen,WANG Xiaojia. Dual resource constraints flexible job shop robust scheduling method[J]. Journal of Mechanical Engineering,2024,60(6):114-126. [2] BRUCKER P, SCHLIE R. Job-shop scheduling with multi-purpose machines[J]. Computing,1990,45(4):369-375. [3] 闫富乾,陈浩杰,丁国富,等. 求解柔性分批调度问题的双层搜索框架入侵杂草算法[J]. 计算机集成制造系统,2023,29(2):556-567. YAN Fuqing,CHEN Haojie,DING Guofu. Improved invasive weed algorithm based on double layer search framework for flexible batch scheduling problem[J]. Computer Integrated Manufacturing Systems,2023,29(2):556-567. [4] ABDOLLAHZADEH SANGROUDI H,RANJBAR- BOURANI M. Solving a flexible job shop lot sizing problem with shared operations using a self-adaptive COA[J]. International Journal of Production Research,2021,59(2):483-515. [5] JI B,ZHANG S J,YU S S,et al. Novel model and solution method for flexible job shop scheduling problem with batch processing machines[J]. Computers & Operations,2024,161:106442. [6] YUNUSOGLU P,TOPALOGLUYILDIZ S. Solving the flexible job shop scheduling and lot streaming problem with setup and transport resource constraints[J]. International Journal of Systems Science,2023,54(11): 2443. [7] LI X,LU J,YANG C,et al. Research of flexible assembly job-shop batch-scheduling problem based on improved artificial bee colony[J]. Frontiers in Bioengineering and Biotechnology,2022,10:909548. [8] XIE F,LI L,LI L,et al. A decomposition-based multi-objective Jaya algorithm for lot-streaming job shop scheduling with variable sublots and intermingling setting[J]. Expert Systems with Applications,2023,228: 120402. [9] 王建华,潘宇杰,孙瑞. 考虑机床折旧的柔性作业车间绿色调度算法[J]. 计算机应用,2020,40(1):43-49. WANG Jianhua,PAN Yujie,SUN Rui. Flexible job-shop green scheduling algorithm considering machine tool depreciation[J]. Journal of Computer Applications,2020,40(1):43-49. [10] YANG B,LIAW P K,MORRISON M,et al. Temperature evolution during fatigue damage[J]. Intermetallics,2005,13(3):419-428. [11] YAN J,HUA D. Energy consumption modeling for machine tools after preventive maintenance[C]. 2010 IEEE International Conference on Industrial Engineering and Engineering Management,Macao,China. 2010: 2201-2205. [12] RAO R. Jaya:A simple and new optimization algorithm for solving constrained and unconstrained optimization problems[J]. Engineering Computations,2016,7(1):19-34. [13] PAN Y,GAO K,LI Z,et al. Solving biobjective distributed flow-shop scheduling problems with lot-streaming using an improved jaya algorithm[J]. IEEE Transactions on Cybernetics,2023,53(6):3818-3828. [14] CALDEIRA R H,GNANAVELBABU A. A Pareto based discrete Jaya algorithm for multi-objective flexible job shop scheduling problem[J]. Expert Systems with Applications,2021,170:114567. [15] BEREN G Y,OMER F Y. Lot streaming in hybrid flowshop scheduling problem by considering equal and consistent sublots under machine capability and limited waiting time constraint[J]. Computers & Industrial Engineering,2022,173:108745. [16] HUANG R H,YU T H. An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting[J]. Applied Soft Computing,2017,57:642-656. [17] 王玉芳,华晓麟,章殿清,等. 基于混合Jaya算法的多时间约束柔性作业车间节能调度[J]. 控制工程,2025,32(6):1074-1085. WANG Yufang,HUA Xiaolin,ZHANG Dianqing,et al. Energy-efficient scheduling of flexible job-shop with multiple temporal constraints based on hybrid jaya algorithm[J]. Control Engineering of China,2025,32(6): 1074-1085. [18] ZHANG H L,XU G J,PAN R L,et al. A novel heuristic method for the energy-efficient flexible job-shop scheduling problem with sequence-dependent set-up and transportation time[J]. Engineering Optimization,2021,54(10):1646-1667. [19] SUN J H,ZHANG G H,LU J,et al. A hybrid many -objective problem with transportation and setup times[J]. Computers & Operations Research,2021,132: 105263. [20] TIAN Y,CHENG R,ZHANG X Y,et al. PlatEMO:a MATLAB platform for evolutionary multi-objective optimization[J]. IEEE Computational Intelligence Magazine,2017,12(4):73-87. [21] ANSARI T,CHANDRA G,GUPTA P K,et al. Synthesis of pine needle cyanoethyl cellulose using Taguchi L25 orthogonal array[J]. Industrial Crops & Products,2023,191:115973. [22] 田志强,姜兴宇,杨国哲,等.一种面向航天复杂构件的柔性作业车间能耗优化调度问题研究[J]. 机械工程学报,2023,59(8):273-287. TIAN Zhiqiang,JIANG Xingyu,YANG Guozhe,et al. Energy efficient scheduling of flexible job shop with aerospace complex components[J]. Journal of Mechanical Engineering,2023,59(8):273-287. [23] LI Y,YANG Z,WANG L,et al. A hybrid imperialist competitive algorithm for energy-efficient flexible job shop scheduling problem with variable-size sublots[J]. Computers & Industrial Engineering,2022,172: 108641. [24] ZHENG X L,WANG L. A collaborative multiobjective fruit fly optimization algorithm for the resource constrained unrelated parallel machine green scheduling problem[J]. IEEE Transactions on Systems,Man,and Cybernetics:Systems,2016,48(5):790-800.