• CN:11-2187/TH
  • ISSN:0577-6686
考虑准备时间和关键目标的柔性作业车间低碳调度研究
李明, 雷德明
Research on Flexible Job Shop Low Carbon Scheduling with Setup Times and Key Objectives
LI Ming, LEI Deming
机械工程学报 . 2019, (21): 139 -149 .  DOI: 10.3901/JME.2019.21.139