[1] BLACKSTONE J H, PHILLIPS D T, HOGG G L. A state-of-the-art survey of dispatching rules for manufacturing job shop operations[J]. International Journal of Production Research, 1982, 20(1):27-45. [2] ALLAHVERDI A, NG C T, CHENG T, et al. A survey of scheduling problems with setup times or costs[J]. European Journal of Operational Research, 2008, 187(3):985-1032. [3] XIE C, ALLEN T T. Simulation and experimental design methods for job shop scheduling with material handling:a survey[J]. The International Journal of Advanced Manufacturing Technology, 2015, 80(1-4):233-243. [4] YOKOYAMA M. Hybrid flow-shop scheduling with assembly operations[J]. International Journal of Production Economics, 2001, 73(1):103-116. [5] LIN B, CHENG T. Fabrication and assembly scheduling in a two-machine flowshop[J]. IIE Transactions, 2002, 34(11):1015-1020. [6] SUNG C S, KIM H A. A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times[J]. International Journal of Production Economics, 2008, 113(2):1038-1048. [7] POTTS C N, WASSENHOVE L V. A branch and bound algorithm for the total weighted tardiness problem[J]. Operations Research, 1985, 33(2):363-377. [8] KUNDAKCI N, KULAK O. Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem[J]. Computers & Industrial Engineering, 2016, 96:31-51. [9] LI N, GAO L, LI P, et al. A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates[J]. Journal of Intelligent Manufacturing, 2013, 24(4):763-774. [10] OZTURK G, BAHADIR O, TEYMOURIFAR A. Extracting priority rules for dynamic multi-objective flexible job shop scheduling problems using gene expression programming[J]. International Journal of Production Research, 2018, 57(1):1-17. [11] PHILIPOOM P R, MARKLAND R E, FRY T D. Sequencing rules, progress milestones and product structure in a multistage job shop[J]. Journal of Operations Management, 1989, 8(3):209-229. [12] REEJA M K, CR F. Dispatching rules for scheduling in assemble job shops-Part 1[J]. International Journal of Production Research, 2000, 38(9):2051-2066. [13] REEJA M K, CR F. Dispatching rules for scheduling in assemble job shops-Part 2[J]. International Journal of Production Research, 2000, 38(10):2349-2360. [14] NATARAJAN K, MOHANASUNDARAM K M, BABU B S, et al. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness[J]. The International Journal of Advanced Manufacturing Technology, 2007, 31(7):751-761. [15] THIAGARAJAN S, RAJENDRAN C. Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs[J]. International Journal of Production Research, 2003, 41(18):4453-4486. [16] 金锋赫,孔繁森,金东园. 基于设备可用时间约束的装配作业车间调度规则[J]. 计算机集成制造系统, 2008, 14(9):1727-1732. JIN Fenghe, KONG Fansen, JIN Dongyuan. Scheduling rules for assembly Job Shop based on machine available time[J]. Computer Integrated Manufacturing Systems, 2008, 14(9):1727-1732. [17] DIMOPOULOS C, ZALZALA A M S. Investigating the use of genetic programming for a classic one-machine scheduling problem[J]. Advances in Engineering Software, 2001, 32(6):489-498. [18] 吕海利,朱家涛,王正国. 装配作业车间的JIT调度研究[J]. 机械工程学报, 2021, 57(5):157-165. LÜ Haili, ZHU Jiatao, WANG Zhengguo, et al. Research of just-in-time scheduling for assembly job shop[J]. Journal of Mechanical Engineering, 2021, 57(5):157-165. [19] 费红霞,潘炼. 基于改进的基因表达式编程算法在作业车间调度问题中的应用[J]. 计算机与数字工程, 2009, 37(6):6-10. FEI Hongxia, PAN Lian. Application of improved gene expression programming for job shop scheduling problem[J]. Computer and Digital Engineering, 2009, 37(6):6-10. [20] 左劼. 基因表达式编程核心技术研究[D]. 成都:四川大学, 2004. ZUO Jie. Research on core technology of gene expression programming[D]. Chengdu:Sichuan University, 2004. [21] 王爱法,杨梅梅,福春霞. 二叉树及其遍历算法的应用[J]. 重庆理工大学学报, 2018, 32(11):194-198. WANG Aifa, YANG Meimei, FU Chunxia. Application of binary tree and its traversal algorithm[J]. Journal of Chongqing University of Technology, 2018, 32(11):194-198. [22] TAY J C, HO N B. Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems[J]. Computers and Industrial Engineering, 2008, 54(3):453-473. |