[1] 翟婉明,赵春发. 现代轨道交通工程科技前沿与挑战[J]. 西南交通大学学报,2016,51(2):209-226.ZHAI Wanming,ZHAO Chunfa. Frontiers and challenges of sciences and technologies in modern railway engineering[J]. Journal of Southwest Jiaotong University,2016,51(2):209-226. [2] GOU Hongye,RAN Zhiwen,YANG Longcheng,et al. Mapping vertical bridge deformations to track geometry for high-speed railway[J]. Steel and Composite Structures,2019,32(4):467-478. [3] CAI C S,SHI X M,VOYIADJIS G Z,et al. Structural performance of bridge approach slabs under given embankment settlement[J]. Journal of Bridge Engineering,2005,10(4):482-489. [4] 宋欢平,边学成,蒋建群,等. 高速铁路路基沉降与列车运行速度关联性的研究[J]. 振动与冲击,2012(10):134-140.SONG Huanping,BIAN Xuecheng,JIANG Jianqun,et al. Correlation between subgrade settlement of high-speed railroad and train operation speed[J]. Journal of Vibration and Shock,2012(10):134-140. [5] 陈兆玮,孙宇,翟婉明. 高速铁路桥墩沉降与钢轨变形的映射关系(Ⅰ):单元板式无砟轨道系统[J]. 中国科学:技术科学,2014,44(7):770-777.CHEN Zhaowei,SUN Yu,ZHAI Wanming. Mapping relationship between pier settlement and rail deformation of high-speed railways-part(I):The unit slab track system[J]. Scientia Sinica (Technologica),2014,44(7):770-777. [6] YAU J D. Response of a train moving on multi-span railway bridges undergoing ground settlement[J]. Engineering Structures,2009,31(9):2115-2122. [7] AHMARI S,YANG M,ZHONG H. Dynamic interaction between vehicle and bridge deck subjected to support settlement[J]. Engineering Structures,2015,84:172-183. [8] 宋国华,高芒芒,黎国清. 桥梁墩台不均匀沉降时的车桥垂向系统耦合振动分析[J]. 中国铁道科学,2010(2):29-33.SONG Guohua,GAO Mangmang,LI Guoqing. Vehicle-bridge vertical system coupled vibration analysis under the uneven settlement of bridge pier and abutment[J]. China Railway Science,2010(2):29-33. [9] CHEN Zhaowei,ZHAI Wanming,CAI Chengbiao,et al. Safety threshold of high-speed railway pier settlement based on train-track-bridge dynamic interaction[J]. Science China-Technological Sciences,2015,58(2):202-210. [10] CHEN Zhaowei,ZHAI Wanming,YIN Qiang. Analysis of structural stresses of tracks and vehicle dynamic responses in train-track-bridge system with pier settlement[J]. Proceedings of the Institution of Mechanical Engineers,Part F:Journal of Rail and Rapid Transit,2018,232(2):421-434. [11] 陈兆玮. 高速铁路桥墩沉降对行车性能影响的研究[D].成都:西南交通大学,2017. CHEN Zhaowei. Influence of pier settlement on dynamic performance of running trains in high-speed railways[D]. Chengdu:Southwest Jiaotong University,2017. [12] 翟婉明. 车辆-轨道耦合动力学[M]. 3版. 北京:科学出版社,2007.ZHAI Wanming. Vehicle-track coupled dynamics[M]. 3rd ed. Beijing:Science Press,2007. [13] CHEN Zhaowei,FANG Hui. An alternative solution of train-track dynamic interaction[J]. Shock and Vibration 2019:1859261. [14] CHEN Zhaowei. Evaluation of longitudinal connected track under combined action of running train and long-term bridge deformation[J]. Journal of Vibration and Control,2020,26(7-8):599-609. [15] 石瑞喜. 桥墩差异沉降规律及其对轨道高低平顺性的影响[J]. 四川建筑,2013(1):94-99.SHI Ruixi. Influence of pier settlement on rail irregularity[J]. Sichuan Architecture,2013(1):94-99. |