[1] PAJOUTAN M, GOLMOHAMMADI A, SEIFBARGHY M. CMS scheduling problem considering material handling and routing flexibility[J]. The International Journal of Advanced Manufacturing Technology, 2014, 72(5-8):881-893.
[2] CHENG H M, YING K C. Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times[J]. Expert Systems with Applications, 2011, 38(12):15517-15522.
[3] ADB K, ABHARY K, MARIAN R. A Methodology for Scheduling Robotic Flexible Assembly Cells Using Fuzzy Logic and Simulation[D]. London:Newswood Limited, 2013.
[4] 孔继利,贾国柱. 考虑搬运时间的多品种、小批量混流制造系统批量加工模式的优化与资源调度[J]. 系统工程理论与实践, 2014, 34(11):2801-2807. KONG Jili, JIA Guozhu. Optimization of the batches processing modes and resource scheduling for mixed-model manufacturing system of multi-variety and small-batch considering handling time[J]. System Engineering Theory and Practice, 2014, 34(11):2801-2807.
[5] 张洁,秦威,宋代立. 考虑工时不确定的混合流水车间滚动调度方法[J]. 机械工程学报, 2015, 51(11):99-108. ZHANG Jie, QIN Wei, SONG Daili. Rescheduling algorithm based on rolling horizon procedure for a dynamic hybrid flow shop with uncertain processing time[J]. Journal of Mechanical Engineering, 2015, 51(11):99-108.
[6] 曾强,杨育,王小磊,等. 并行机作业车间等量分批多目标优化调度[J]. 计算机集成制造系统, 2011, 17(4):816-825. ZENG Qiang, YANG Yu, WANG Xiaolei, et al. Multi-objective optimization method for equal lot scheduling problem of Job Shop with parallel machines[J]. Computer Integrated Manufacturing Systems, 2011, 17(4):816-825.
[7] 白俊杰,龚毅光,王宁生,等. 批量生产柔性作业车间优化调度研究[J].机械科学与技术, 2010, 29(3):293-298. BAI Junjie, GONG Yiguang, WANG Ningsheng, et al. Flexible job shop scheduling of batch production[J]. Mechanical Scienceand Technology for Aerospace Engineering, 2010, 29(3):293-298.
[8] 徐本柱,费晓璐,章兴玲. 柔性作业车间批量划分与并行调度优化[J].计算机集成制造系统, 2016, 22(8):1953-1964. XU Benzhu, FEI Xiaolu, ZHANG Xingling. Batch division and parallel scheduling optimization of flexible job shop[J]. Computer Integrated Manufacturing Systems, 2016, 22(8):1953-1964.
[9] OZTURK C, TUNALI S, HNICH B, et al. Balancing and scheduling of flexible mixed model assembly lines with parallel stations[J]. The International Journal of Advanced Manufacturing Technology, 2013, 67(9):2577-2591.
[10] ANDRES C, MIRALLES C, PASTOR R. Balancing and scheduling tasks in assembly lines with sequence-dependent setup times[J]. European Journal of Operational Research, 2008, 187(3):1212-1223.
[11] ZACHARUA P T, NEARCHOU A C. A population-based algorithm for the bi-objective assembly line worker assignment and balancing problem[J]. Engineering Applications of Artificial Intelligence, 2016, 49(3):1-9.
[12] 李明,唐秋华,席忠民,等. 基于多层规划的单边多目标装配线平衡调度模型[J]. 系统工程理论与实践, 2011, 31(11):2185-2190. LI Ming, TANG Qiuhua, XI Zhongmin, et al. One-sided multi-objective assembly line balancing model based on multi-layer programming[J]. System Engineering Theory and Practice, 2011, 31(11):2185-2190.
[13] 韩煜东,董双飞,谭柏川. 基于改进遗传算法的混装线多目标优化[J]. 计算机集成制造系统, 2015, 21(6):1476-1485. HAN Yudong, DONG Shuangfei, TAN Baichuan. Multi-objective optimization for mixed-model assembly line balancing problem based on improved genetic algorithm[J]. Computer Integrated manufacturing Systems, 2015, 21(6):1476-1485.
[14] PAJOUTAN M, GOLMOHAMMADI A, SEIFBARGHY M. CMS scheduling problem considering material handling and routing flexibility[J]. The International Journal of Advanced Manufacturing Technology, 2014, 72(58):881-893.
[15] 高亮,张国辉,王晓娟. 柔性作业车间调度智能算法及其应用[M]. 武汉:华中科技大学出版社, 2012. GAO Liang, ZHANF Guohui, WANG Xiaojuan. Flexible job shop scheduling and application based on intelligence algorithm[M]. Wuhan:Huazhong University of Science & Technology Press, 2012. |