›› 2005, Vol. 41 ›› Issue (10): 75-79.
• Article • Previous Articles Next Articles
Zhang Jie;Zhai Wenbin;Yan Juanqi;Ma Dengzhe
Published:
Abstract: For the lack of rescheduling optimization approach for semiconductor fabrication line status in quo, a novel fuzzy neural networks based algorithm for rescheduling strategies optimization of semiconductor fabrication line is proposed. The rescheduling strategies are divided into line layer, machine group layer and machine layer. The samples for FNN are setup by simulation evaluation. The relation between the input of FNN, such as disturbance, system state parameters, and output of FNN, optimal rescheduling strategy, is built by FNN. With an illustrative example of a 152 mm semiconductor fabrication line in shanghai, the lineal regression between FNN output and targets demonstrates the effectiveness of the approach.
Key words: Fuzzy neural networks, Rescheduling, Semiconductor fabrication line
CLC Number:
TH166
Zhang Jie;Zhai Wenbin;Yan Juanqi;Ma Dengzhe. FUZZY NEURAL NETWORKS BASED RESCHEDULING STRATEGIES OPTIMIZATION OF SEMICONDUCTOR FABRICATION LINE[J]. , 2005, 41(10): 75-79.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.cjmenet.com.cn/EN/
http://www.cjmenet.com.cn/EN/Y2005/V41/I10/75