| [1] |
ZHANG Nianhua, ZHANG Yongkang, CHEN Jicheng, LI Pengtao, LI Yan, ZHANG Hui.
Robust Cooperative Control Strategy for ESC and TVC of Distributed-driven Vehicles Based on Multi-agent System
[J]. Journal of Mechanical Engineering, 2026, 62(8): 365-381.
|
| [2] |
HUANG Ming, HUANG Sihan, CHEN Jianpeng, DONG Wei, WANG Baicun, RUAN Bing, GAO Yunpeng, WANG Guoxin, YAN Yan.
Dynamic Scheduling Optimization of Island Assembly Lines Under Uncertain Disturbances by Multi-objective Deep Reinforcement Learning
[J]. Journal of Mechanical Engineering, 2026, 62(5): 74-87.
|
| [3] |
TANG Xiaolin, GAN Jiongpeng, ZHANG Zhenguo.
Research on the Collaborative Energy Management Strategy of Hybrid Electric Vehicle Platoon Based on Multi-agent Deep Reinforcement Learning in the Transverse and Longitudinal Coupled Car-following Scenario
[J]. Journal of Mechanical Engineering, 2025, 61(2): 236-246.
|
| [4] |
WU Xiuli, YAN Xiaoyan.
An Improved Q Learning Algorithm to Optimize Green Dynamic Scheduling Problem in a Reentrant Hybrid Flow Shop
[J]. Journal of Mechanical Engineering, 2023, 59(13): 246-259.
|
| [5] |
SUN Shudong, ZHOU Xinmin, CHANG Shengbo.
Negotiation Scheduling Algorithm for Multi-agent Job Shop with Private Information
[J]. Journal of Mechanical Engineering, 2022, 58(9): 210-217.
|
| [6] |
CAI Lei, LI Wenfeng, LUO Yun.
Framework and Algorithm of Customized Workshop Production-logistics Collaborative Scheduling
[J]. Journal of Mechanical Engineering, 2022, 58(7): 214-226.
|
| [7] |
XIE Zhi-qiang, XIA Ying-chun.
Multi-shop Idle Capacity Scheduling Method Based on Genetic Algorithm and Branch and Bound
[J]. Journal of Mechanical Engineering, 2022, 58(22): 462-472.
|
| [8] |
Shixian Feng, Mei Yu, Bo Wei, Feng Xiao.
Active Power Consensus Control for Wind Turbines with Time Delays*
[J]. Chinese Journal of Electrical Engineering, 2022, 8(2): 86-96.
|
| [9] |
Lü Yan, XU Zhengjun, LI Congbo, LI Lingling, YANG Miao.
Comprehensive Energy Saving Optimization of Processing Parameters and Job Shop Dynamic Scheduling Considering Disturbance Events
[J]. Journal of Mechanical Engineering, 2022, 58(19): 242-255.
|
| [10] |
XIONG Hegen, WU Jian, YANG Guangcan.
Scheduling Simulation for Flexible Dynamic Job Shop Scheduling Problem with Jobs Releasing and Delivering Both in Batches
[J]. Journal of Mechanical Engineering, 2020, 56(14): 231-244.
|
| [11] |
NIU Limin, YANG Hongyuan, ZHOU Yazhou, Lü Jianmei.
Hybrid Electric Vehicle Integrated Control Strategy Based on Multi-agent
[J]. Journal of Mechanical Engineering, 2019, 55(12): 168-177,188.
|
| [12] |
ZHANG Zequn, TANG Dunbing, JING Yongqiao, ZHANG Haitao.
Self-organizing Production Technology for Discrete Workshop Scheduling Driven by Internet of Things
[J]. Journal of Mechanical Engineering, 2018, 54(16): 34-44.
|
| [13] |
Tomislav Dragicevic, Dan Wu, Qobad Shafiee, Lexuan Meng.
Distributed and Decentralized Control Architectures for Converter-Interfaced Microgrids
[J]. Chinese Journal of Electrical Engineering, 2017, 3(2): 41-52.
|
| [14] |
Yingfeng Xu,Haining Wang.
Structure of Decision Support System Based on Multi-Agent for Micro-Grid Operation
[J]. Journal of Electrical Engineering, 2016, 11(8): 30-36.
|
| [15] |
Lu Zhigang,Chen Yuemin.
Multi-agent Identification and Estimation of Transmission Line Parameters Based on Improved Clustering
[J]. Journal of Electrical Engineering, 2015, 10(4): 70-81.
|