[1] 郭和平,李彪,李玉生. 60Si2MnA弹条断裂分析[J]. 失效分析与预防,2011(2):90-93,123. GUO Heping,LI Biao,LI Yusheng. Fracture analysis of 60Si2MnA spring rods for laying rail during fatigue life test[J]. Part A:Phys. Test,2011(2):90-93,123. [2] 闫志波. 60Si2MnA弹条疲劳断裂原因分析[J]. 热加工工艺,2010(18):202-203. YAN Zhibo. Reason analysis about fatigue fracture of 60si2mna spring bar[J]. Material & Heat Treatment,2010(18):202-203. [3] 苏建锋,杜瑞青,王军,等. Ⅱ型弹条断裂原因分析[J] 金属热处理,2015,40(增刊):78-80. SU Jianfeng,DU Ruiqing,WANG Jun,et al. Ⅱ Type spring rod fracture analysis[J]. Heat Treatment of Metals. 2015,40(Suppl.):78-80. [4] BARTOŠ D,LAKUŠIĆ S,VINSKI T. Numerical analysis of the rail fastening spring clip type SKL-1[C]//Fourth Youth Symposium on Experimental Solid Mechanics-4th YSESM,4-7.05.2005,University of Bologna,Bologna,Italia. Fourth Youth Symposium on Experimental Solid Mechanics (Extended Summaries)/Freddi,Alessandro,2005:119-120. [5] 肖俊恒,赵汝康. 弹条扣压件的优化设计与研究[J]. 中国铁道科学,1995(4):42-47. XIAO Junheng,ZHAO Rukang. Study on optimum design of bar-spring clip[J]. China Railway Science,1995(4):42-47. [6] 尚红霞,温泽峰,吴磊,等. 地铁扣件Ⅲ型弹条失效有限元分析[J]. 工程力学,2015(9):210-215. SHANG Hongxia,WEN Zefeng,WU Lei,et al. Finite element analysis of type Ⅲ rail fastening clip failure in metro lines[J]. Engineering Mechanics,2015(9):210-215. [7] 武青海,陈厚嫦,周虹伟,等. 应用非线性接触理论分析弹条Ⅲ型扣件中弹条的应力和变形[J]. 中国铁道科学,2003(1):71-75. WU Qinghai,CHEN Houchang,ZHOU Hongwei,et al. Stress and deformation analysis of type Ⅲfastener elastic bar by non-linear contact theory[J]. China Railway Science,2003(1):71-75. [8] MOHAMMADZADEH S,AHADI S,NOURI M. Stress-based fatigue reliability analysis ofthe rail fastening spring clip under traffic loads[J]. Latin American Journal of Solids & Structures,2014,11(6):992-1011. [9] KESHAVARZIAN H,MOHAMMADZADEH S,AHADI S. Assessment of fracture reliability analysis of crack growth in spring clip type Vossloh SKL14[J]. Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk & Reliability,2014,228(5):460-468. [10] SADEGHI J,FESHARAKI M,KHAJEHDEZFULY A. Influences of train speed and axle loads on life cycle of rail fastening clips[J]. Transactions-Canadian Society for Mechanical Engineering,2015,39(1):1-11. [11] 朱胜阳,蔡成标,尹镪,等. 高速铁路扣件弹条动力学分析[J]. 工程力学,2013(6):254-258,287. ZHU Shengyang,CAI Chengbiao,YIN Qiang,et al. Dynamic analysis of rail fastening clip in high-speed railway[J]. Engineering Mechanics,2013(6):254-258,287. [12] SMUTNY J. Measurement and analysis of dynamic and acoustic parameters of rail fastening[J]. NDT&E International,2004,(37):119-129 [13] 刘卫丰,刘维宁,吴宗臻,等. 北京地铁剪切型减振器扣件钢轨波磨治理的试验研究[J]. 机械工程学报,2015,51(21):73-79. LIU Weifeng,LIU Weining,WU Zongzhen,et al. Test study on treating rail corrugation for egg fastener in Beijing Metro[J]. Journal of Mechanical Engineering,2015,51(21):73-79. [14] 李伟,杜星,王衡禹,等. 地铁钢轨一种波磨机理的调查分析[J]. 机械工程学报,2013,49(16):26-32. LI Wei,DU Xing,WANG Hengyu,et al. Investigation into the mechanism of type of rail corrugation of metro[J]. Journal of Mechanical Engineering,2013,49(16):26-32. [15] 余自若,袁媛,张远庆,等. 高速铁路扣件系统弹条疲劳性能研究[J]. 铁道学报,2014(7):90-95. YU Ziruo,YUAN yuan,ZHANG Yuanqing,et al. Fatigue properties of elastic bars of fastenting systems installed with high-speed railways[J]. Journal of the China Railway Society,2014(7):90-95. [16] 蔡成标,徐鹏. 弹性支承块式无砟轨道结构参数动力学优化设计[J]. 铁道学报,2011(1):69-75. CAI Chengbiao,XU Peng. Dynamic optimization design of the structural parameters of low vibration track[J]. Journal of the China Railway Society,2011(1):69-75. [17] 闻邦椿. 机械设计手册(第2卷)[M]. 北京:机械工业出版社,2010. WEN Bangchun. Mechanical design manual (volume second)[M]. Beijing:China Machine Press,2010. [18] 杨吉忠,赵鑫,胡连军,等. 40t轴重重载铁路扣件刚度研究[J]. 铁道工程学报,2016(10):55-60. YANG Jizhong,ZHAO Xin,HU Lianjun,et al. Research on the fastener stiffness of heavy haul railway running 40t axle-load trains[J]. Journal of Railway Engineering Society,2016(10):55-60. [19] 赫丹,向俊,曾庆元. 弹性支承块式轨道在高速列车作用下的动力响应分析[J]. 中南大学学报,2010(2):770-774. HE Dan,XIANG Jun,ZENG Qingyuan. Dynamic response analysis of low vibration track subjected to high-speed train[J]. Journal of Central South University,2010(2):770-774. |