[1] LANG F, FINK A, BRANDT T. Design of automated negotiation mechanisms for decentralized heterogeneous machine scheduling[J]. European Journal of Operational Research, 2016, 248(1): 192-203. [2] HOMBERGER J, FINK A. Generic negotiation mechanisms with side payments – design, analysis and application for decentralized resource-constrained multi-project scheduling problems[J]. European Journal of Operational Research, 2017, 261(3): 1001-1012. [3] HOMBERGER J. A (μ, λ)-coordination mechanism for agent-based multi-project scheduling[J]. OR Spectrum, 2012, 34(1): 107-132. [4] FINK A, HOMBERGER J. An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectives[J]. Flexible Services and Manufacturing Journal, 2013, 25(1-2): 94-121. [5] LANG F, FINK A. Learning from the metaheuristics: Protocols for automated negotiations[J]. Group Decision and Negotiation, 2015, 24(2): 299-332. [6] ZHANG Jie, SHENG Xia, ZHANG Peng, et al. Two-stage unsupervised feature selection method oriented to manufacturing procedural data[J]. Journal of Mechanical Engineering, 2019, 55(17): 133-144. 张洁, 盛夏, 张朋, 等. 面向制造过程数据的两阶段无监督特征选择方法[J]. 机械工程学报, 2019, 55(17): 133-144. [7] EBRAHIMI A, JEON H W, LEE S, et al. Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms[J]. Computers & Industrial Engineering, 2020, 141: 106295. [8] LIU Qiong, MEI Zhen. Integrated optimization of process planning and shop scheduling for reducing manufacturing carbon emissions[J]. Journal of Mechanical Engineering, 2017, 53(11): 164-174. 刘琼, 梅侦. 面向低碳的工艺规划与车间调度集成优化[J]. 机械工程学报, 2017, 53(11): 164-174. [9] LI Congbo, SHEN Huan, LI Lingling, et al. A batch splitting flexible job shop scheduling model for energy savingunder alternative process plans[J]. Journal of Mechanical Engineering, 2017, 53(5): 12-23. 李聪波, 沈欢, 李玲玲, 等. 面向能耗的多工艺路线柔性作业车间分批优化调度模型[J]. 机械工程学报, 2017, 53(5): 12-23 [10] WU Xiuli, SUN Yangjun. Flexible job shop green scheduling problem with multi-speed machine[J]. Computer Integrated Manufacturing Systems, 2018, 24(4): 862-875. 吴秀丽, 孙阳君. 机器多转速的柔性作业车间绿色调度问题[J]. 计算机集成制造系统, 2018, 24(4): 862-875 [11] WU Xiaoqiang, TIAN Songling, ZHENG Shuxian, et al. Real-time scheduling method of intelligent manufacturing shop floor based on multi-agent[J]. Computer Integrated Manufacturing Systems, 2020, 26(10): 2703-2713. 吴晓强, 田松龄, 郑淑贤, 等. 面向开放式结构产品的智能制造车间实时调度方法[J]. 计算机集成制造系统, 2020, 26(10): 2703-2713 [12] LEI Deming, SU Bin. Multi-class teaching-learning-based optimization for multi-objective distributed hybrid flow shop scheduling[J]. Control and Decision, 2021, 36(2): 303-313. 雷德明, 苏斌. 基于多班教学优化的多目标分布式混合流水车间调度[J]. 控制与决策, 2021, 36(2): 303-313 [13] WU Zigao, SUN Shudong. Risk cost estimation of job shop scheduling with random machine breakdowns[C]// 11th CIRP Conference on Industrial Product-Service Systems, Zhuhai, 29-31 May 2019, Procedia CIRP 2019, 83: 404-409. [14] LI Xinyu, GAO Liang. An effective hybrid genetic algorithm and tabu search for flexible jobshop scheduling problem[J]. International Journal of Production Economics, 2016, 174: 93-110. [15] ZHOU Min, SUN Shudong. Genetic algorithm: Theory and applications[M]. Beijing: National Defense Industry Press, 1999. 周明, 孙树栋. 遗传算法原理及应用[M]. 北京: 国防工业出版社, 1999. [16] PIVATO M. Formal utilitarianism and range voting[J]. Mathematical Social Sciences, 2014, 67: 50-56. [17] WIBOWO Y, MAHARDIKA N S, AFRIZAL R, et al. Design of the expert system for Edamamegrading using forward chaining method[J]. Sustainable Environment Agricultural Science, 2020, 4(1): 26-37. [18] GONCALVES J F, DE MAGALHAES MENDES J J, RESENDE M G C. A hybrid genetic algorithm for the job shop scheduling problem[J]. European Journal of Operational Research, 2005, 167(1): 77-95. [19] TANG D, DAI M. Energy-efficient approach to minimizing the energy consumption in an extended job-shop scheduling problem[J]. Chinese Journal of Mechanical Engineering, 2015, 28: 1048-1055. [20] HILLINGER C. The case for utilitarian voting[J]. Discussion Papers in Economics, 2005, 23(3): 295-321. [21] SEN A. Majority decision and Condorcet winners[J]. Social Choice and Welfare, 2020, 54(1): 1-7. [22] NITISIRI K, GEN M, OHWADA H. A parallel multi-objective genetic algorithm with learning-based mutation for railway scheduling[J]. Computers & Industrial Engineering, 2019, 130: 381-394. [23] WANG J Q, FAN G Q, ZHANG Y Q, et al. Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes[J]. European Journal of Operational Research, 2017, 258(2): 478-490. [24] ZHANG Y F, ZHANG G, WANG J Q, et al. Real-time information capturing and integration framework of the internet of manufacturing things[J]. International Journal of Computer Integrated Manufacturing, 2015, 28(8): 811-822. [25] NIU G G, SUN S D, LAFON P, et al. A decomposition approach to job-shop scheduling problem with discretely controllable processing times[J]. Science China: Technological Sciences, 2011, 54(5): 1240-1248. |