[1] 张长胜,孙吉贵,杨轻云,等. 一种求解车间调度的混合算法[J]. 自动化学报,2009,3(3):332-336. ZHANG Changsheng,SUN Jigui,YANG Qingyun,et al. A hybrid algorithm for flowshop scheduling problem[J]. Acta Automatica Sinica,2009,3(3):332-336. [2] 雷德明. 基于新型教学优化算法的低碳柔性作业车间调度[J]. 控制与决策,2017,32(9):1621-1627. LEI Deming. Novel teaching-learning-based optimization algorithm for low carbon scheduling of flexible job shop[J]. Control and Decision,2017,32(9):1621-1627. [3] SHAO W,PI D,SHAO Z. A hybrid discrete teaching-learning based meta-heuristic for solving no-idle flow shop scheduling problem with total tardiness criterion[J]. Computers and Operations Research,2018,94:89-105. [4] 姜天华. 混合灰狼优化算法求解柔性作业车间调度问题[J]. 控制与决策,2018,33(3):503-508. JIANG Tianhua. Flexible job shop scheduling problem with hybrid grey wolf optimization algorithm[J]. Control and Decision,2018,33(3):503-508. [5] QIN W,ZHANG J,SONG D. An improved ant colony algorithm for dynamic hybrid flow shop scheduling with uncertain processing time[J]. Journal of Intelligent Manufacturing,2018,29(4):891-9041-14. [6] GONG G,DENG Q,GONG X,et al. A new double flexible job-shop scheduling problem integrating processing time,green production,and human factor indicators[J]. Journal of Cleaner Production,2018,174:560-576. [7] 牟健慧,郭前建,高亮,等. 基于混合的多目标遗传算法的多目标流水车间逆调度问题求解方法[J]. 机械工程学报,2016,52(22):186-197. MOU Jianhui,GUO Qianjian,GAO Liang,et al. Multi-objective genetic algorithm for solving multi-objective flow-shop inverse scheduling problems[J]. Journal of Mechanical Engineering,2016,52(22):186-197. [8] NOUIRI M,BEKRAR A,JEMAI A,et al. An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem[J]. Journal of Intelligent Manufacturing,2018,29(3):603-615. [9] 谢志强. 工件间有约束的复杂产品工序调度研究[D]. 哈尔滨:哈尔滨理工大学,2009. XIE Zhiqiang. Study on operation scheduling of complex product with constraint among jobs[D].Harbin:Harbin University of Science and Technology,2009. [10] 谢志强,刘胜辉,乔佩利. 基于ACPM和BFSM的动态Job-Shop调度算法[J]. 计算机研究与发展,2003,40(7):977-983. XIE Zhiqiang,LIU Shenghui,QIAO Peili. Dynamic job-shop scheduling algorithm based on ACPM and BFSM[J]. Journal of Computer Research and Development,2003,40(7):977-983. [11] 谢志强,杨静,周勇,等. 基于工序集的动态关键路径多产品制造调度算法[J]. 计算机学报,2011,34(2):406-412. XIE Zhiqiang,YANG Jing,ZHOU Yong,et al. Dynamic critical paths multi-Product manufacturing scheduling algorithm based on operation set[J]. Chinese Journal of Computers,2011,34(2):406-412. [12] 谢志强,齐永红,杨静. 存在多设备工序的综合调度算法[J]. 机械工程学报,2014,50(24):191-200. XIE Zhiqiang,QI Yonghong,YANG Jing. Dynamic critical paths multi-Product manufacturing scheduling algorithm based on operation set[J]. Journal of Mechanical Engineering,2014,50(24):191-200. [13] 谢志强,张晓欢,高一龙,等. 考虑串行工序紧密度的择时综合调度算法[J]. 机械工程学报,2018,54(6):191-202. XIE Zhiqiang ZHANG Xiaohuan GAO Yilong,et al. Time-selective integrated scheduling algorithm considering the compactness of serial processes[J]. Journal of Mechanical Engineering,2018,54(6):191-202. [14] 谢志强,张晓欢,辛宇,等. 考虑后续工序的择时综合调度算法[J]. 自动化学报,2018,44(2):344-362. XIE Zhiqiang,ZHANG Xiaohuan,XIN Yu,et al. Time-selective integrated scheduling algorithm considering posterior processes[J]. Acta Automatica Sinica,2018,44(2):344-362. [15] 李志敏. 工序间存在零等待约束的产品加工调度研究[D]. 哈尔滨:哈尔滨理工大学,2009. LI Zhimin. Study on product scheduling problem with no-wait constrains between operations[D].Harbin:Harbin University of Science and Technology,2009. [16] 谢志强,滕宇峥,杨静. 紧密衔接工序组联动的综合调度算法[J]. 自动化学报,2011,37(3):117-125. XIE Zhiqiang,TENG Yuzheng,YANG Jing.Integrated scheduling algorithm with no-wait constraint operationgroup[J].Acta Automatica Sinica,2011,37(3):117-125. [17] 谢志强,辛宇,杨静. 基于逆序信号驱动的紧密衔接综合调度算法[J]. 计算机研究与发展,2013,50(8):1710-1721. XIE Zhiqiang,XIN Yu,YANG Jing.No-wait Integrated scheduling algorithm based on reversed order signal-driven[J].Journal of Computer Research and Development,2013,50(8):1710-1721. [18] XIE Z Q,SU W X,GUO H,et al. The integrated flexible scheduling algorithm of complex product with no-wait constraint between procedures[C]//International Forum on Strategic Technology. IEEE,2017:249-253. [19] 赵诗奎,韩青,王桂从. 基于虚拟零部件级别分区编码的产品综合调度算法[J]. 计算机集成制造系统,2015,21(9):2435-2445. ZHAO Shikui,HAN Qing,WANG Guicong. Product comprehensive scheduling algorithm based on virtual component level division coding[J]. Computer Integrated Manufacturing Systems,2015,21(9):2435-2445. [20] 石飞,赵诗奎. 基于工序约束链编码的遗传算法求解产品综合调度问题[J]. 中国机械工程,2017,28(20):2483-2492. SHI Fei,ZHAO Shikui. Product comprehensive scheduling problems solved by genetic algorithm based on operation constraint chain coding[J]. China Mechanical Engineering,2017,28(20):2483-2492. [21] 张其亮,俞祚明. 基于优势种群的离散果蝇优化算法求解无等待流水车间调度问题[J]. 计算机集成制造系统,2017,23(3):609-615. ZHANG Qiliang,YU Zuoming. Discrete fruit fly optimization algorithm based on dominant population for solving no-wait flow shop scheduling problem[J]. Computer Integrated Manufacturing Systems,2017,23(3):609-615. [22] 潘全科,王文宏,朱剑英. 解决无等待流水车间调度问题的离散粒子群优化算法[J]. 计算机集成制造系统,2007,13(6):1127-1130. PAN Quanke,WANG Wenhong,ZHU Jianying. Modified discrete particle swarm optimization algorithm for no-wait flow shop problem[J]. Computer Integrated Manufacturing Systems,2007,13(6):1127-1130. [23] RIAHI V,KAZEMI M. A new hybrid ant colony algorithm for scheduling of no-wait flowshop[J]. Operational Research,2018,18(1):55-74. [24] BOŻEJKO W,MAKUCHOWSKI M. Solving the no-wait job-shop problem by using genetic algorithm with automatic adjustment[J]. International Journal of Advanced Manufacturing Technology,2011,57(5-8):735-752. [25] SUNDAR S,SUGANTHAN P N,JIN C T,et al. A hybrid artificial bee colony algorithm for the job-shop scheduling problem with no-wait constraint[J]. Soft Computing,2017,21(5):1193-1202. [26] PAN J,HUANG H C. A hybrid genetic algorithm for no-wait job shop scheduling problems[J]. Expert Systems with Applications,2009,36(3):5800-5806. [27] 谢志强,李志敏,郝淑珍,等. 工序间存在零等待约束的复杂产品调度研究[J]. 自动化学报,2009,35(7):983-989. XIE Zhiqiang,LI Zhimin,HAO Shuzhen,et al. Study on complex product scheduling problem with no-wait constraint between operations[J]. Acta Automatica Sinica,2009,35(7):983-989. [28] 王凌. 车间调度及其遗传算法[M]. 北京:清华大学出版社,2003. WANG Ling. Job shop scheduling and its genetic algorithm[M]. Beijing:Tsinghua University Press,2003. [29] 苏财茂,柯映林. 面向协同设计的任务规划与解耦策略[J]. 计算机集成制造系统,2006,12(1):21-26. SU Caimao,KE Yinglin. Task planning and decoupling strategy for collaborative design[J]. Computer Integrated Manufacturing Systems,2006,12(1):21-26. [30] HOU E S H,ANSARI N,REN H. A genetic algorithm for multiprocessor scheduling[J]. IEEE Trans Parallel and Distributed Systems,1994,5(2):113-120. [31] STEWARD D V. The design structure system:A method for managing the design of complex systems[J]. Engineering Management IEEE Transactions on, 1981, EM-28(3):71-74. [32] PINEDO M. Scheduling:Theory,algorithms,and systems[M]. 5th ed. Cham Heidelberg:Springer,2015. |